Hoist Scheduling for multi-part CHSP in complex lines' configuration
暂无分享,去创建一个
[1] Lei Lei,et al. Optimal Cyclic Scheduling Of A Robotic Processing Line With Two-Product And Time-Window Constraints , 2001 .
[2] Y. Ge,et al. Crane scheduling with time windows in circuit board production lines , 1995 .
[3] Philippe Lacomme,et al. Metaheuristics for the Stochastic Hoist Scheduling Problem (SHSP) , 2001 .
[4] Yun Jiang,et al. Cyclic scheduling of a single hoist in extended electroplating lines: a comprehensive integer programming solution , 2002 .
[5] Bruno Legeard,et al. Hoist scheduling problem: an approach based on constraint logic programming , 1992, Proceedings 1992 IEEE International Conference on Robotics and Automation.
[6] A Cyclic Approach for the Multi-Product Hoist Scheduling Problem , 2000 .
[7] Pengyu Yan,et al. Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times , 2010 .
[8] Yuehwern Yih,et al. An algorithm for hoist scheduling problems , 1994 .
[9] Zelda B. Zabinsky,et al. An algorithm for scheduling a chemical processing tank line , 1993 .
[10] W. Ng. A branch and bound algorithm for hoist scheduling of a circuit board production line , 1996 .
[11] Ling Li,et al. Single hoist cyclic scheduling with multiple tanks: a material handling solution , 2003, Comput. Oper. Res..
[12] Eugene Levner,et al. Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence, setups, and time-window constraints , 2008, Eur. J. Oper. Res..
[13] Henry L. W. Nuttle,et al. Hoist Scheduling For A PCB Electroplating Facility , 1988 .
[14] M. Benrejeb,et al. Genetic algorithm for a cyclic Hoist Scheduling Problem with time-window constraints and heterogeneous part jobs , 2010, 18th Mediterranean Conference on Control and Automation, MED'10.
[15] L. W. Phillips,et al. Mathematical Programming Solution of a Hoist Scheduling Program , 1976 .
[16] Pierre Baptiste,et al. Constraint-based model for the cyclic multi-hoists scheduling problem , 2000 .
[17] Ronald D. Armstrong,et al. A bounding scheme for deriving the minimal cycle time of a single-transporter N-stage process with time-window constraints , 1994 .
[18] Marie-Ange Manier,et al. A Classification for Hoist Scheduling Problems , 2003 .
[19] Chengbin Chu,et al. Cyclic hoist scheduling in large real-life electroplating lines , 2007, OR Spectr..
[20] Joon-Mook Lim,et al. A genetic algorithm for a single hoist scheduling in the printed-circuit-board electroplating line , 1997 .
[21] Manuel Mateo Doll. Procedimientos de secuenciación y programación en un sistema productivo de estaciones en serie con transportadores asíncronos de material , 2001 .