Demonstration of the Early-on Manpower Requirements Estimation Methodology: M1 Abrams Main Battle Tank

Abstract : The contractor determined, very early in the acquisition process, the manpower demand over the life cycle of the M1 tank. The resulting estimates are analyzed and compared with the Army's current M1 manning requirements. Finally, the estimates, which are developed at the occupational specialty level, are translated into requirements for general categories of aptitude.