Grouping machines for effective workload control
暂无分享,去创建一个
[1] Joel D. Wisner,et al. A review of the order release policy research , 1995 .
[2] Jwm Will Bertrand,et al. An investigation of order release and flow time allowance policies for assembly job shops , 2002 .
[3] L. Schrage,et al. Queueing systems, Vol. I: Theory , 1977, Proceedings of the IEEE.
[4] Paul S. Park,et al. Workload smoothing in a bottleneck job shop , 1996 .
[5] R. Butterworth,et al. Queueing Systems, Vol. II: Computer Applications. , 1977 .
[6] Lawrence D. Fredendall,et al. Load smoothing by the planning and order review/release systems: A simulation experiment , 1991 .
[7] Gerard Gaalman,et al. Exploring applicability of the workload control concept , 2004 .
[8] T.C.E. Cheng,et al. A state-of-the-art review of parallel-machine scheduling research , 1990 .
[9] Ihsan Sabuncuoglu,et al. Analysis of order review/release problems in production systems , 1999 .
[10] Martin Land,et al. Workload control in job shops, grasping the tap , 2004 .
[11] Leonard Kleinrock,et al. Queueing Systems - Vol. 1: Theory , 1975 .
[12] David L. Woodruff,et al. CONWIP: a pull alternative to kanban , 1990 .
[13] John A. Buzacott,et al. Stochastic models of manufacturing systems , 1993 .
[14] P. S. Park,et al. Load smoothing with feedback in a bottleneck job shop , 1995 .
[15] Martin Land,et al. Parameters and sensitivity in workload control , 2006 .
[16] G. Gaalman,et al. The influence of shop characteristics on workload control , 2000 .
[17] Madjid Tavana,et al. Optimal allocation of arrivals to a collection of parallel workstations , 1997 .
[18] Martin Land,et al. Workload control concepts in job shops A critical assessment , 1995 .
[19] Gerard Gaalman,et al. Towards simple and robust workload norms , 1996 .
[20] Brian G. Kingsman,et al. Responding to customer enquiries in make-to-order companies Problems and solutions , 1996 .
[21] Gerard Gaalman,et al. Reducing feedback requirements of workload control , 2004 .
[22] Gerard Gaalman,et al. The performance of workload control concepts in job shops: improving the release method , 1996 .
[23] Donatella Corti,et al. A capacity-driven approach to establish reliable due dates in a MTO environment , 2006 .
[24] Wallace J. Hopp,et al. Factory physics : foundations of manufacturing management , 1996 .
[25] Brian G. Kingsman. Modelling input-output workload control for dynamic capacity planning in production planning systems , 2000 .
[26] Brian G. Kingsman,et al. The relative contributions of input and output controls on the performance of a workload control system in Make-To-Order companies , 2002 .
[27] S. T Enns,et al. The effectiveness of input control based on aggregate versus bottleneck work loads , 2002 .
[28] Jwm Will Bertrand,et al. Production control and information systems for component-manufacturing shops , 1981 .
[29] H. Missbauer. Order release and sequence-dependent setup times , 1997 .
[30] Alberto Portioli,et al. The impact of parameters setting in load oriented manufacturing control , 1998 .
[31] Giovanni Miragliotta,et al. Workload control: a comparison of theoretical and practical issues through a survey in field , 2000 .