The impact of sub-hourly modelling in power systems with significant levels of renewable generation

The objective of this work is to determine the impact of sub-hourly modelling of a power system with significant amounts of wind generation. This paper presents the modelling of the Irish power system for a one year period at 5min, 15min, 30min and 60min resolution simulations using a unit commitment and economic dispatch model assuming perfect foresight. The work examines how much operational costs increase with more accurate resolution. Results show that increased temporal resolution captures more variability in system load and renewable generation, and is necessary to capture the inflexibilities of thermal units that lead to more realistic estimations in total generation costs. Significant cycling and ramping of units is also captured in higher resolution modelling that hourly resolution modelling is unable to capture.

[1]  Yasumasa Fujii,et al.  Long-term scenario analysis of nuclear energy and variable renewables in Japan's power generation mix considering flexible power resources , 2015 .

[2]  Javier Contreras,et al.  GARCH-based put option valuation to maximize benefit of wind investors , 2014 .

[3]  Sanna Syri,et al.  Wind Integration into Energy Systems with a High Share of Nuclear Power—What Are the Compromises? , 2015 .

[4]  D. J. Swider,et al.  All island grid study. Wind variability management studies , 2008 .

[5]  Aoife Foley,et al.  Impact of offshore wind power forecast error in a carbon constraint electricity market , 2014 .

[6]  Liangying Hecker,et al.  Inter-regional transmission development for Eastern Wind Integration and Transmission Study , 2010, IEEE PES General Meeting.

[7]  Lennart Söder,et al.  Design and operation of power systems with large amounts of wind power , 2009 .

[8]  Michael Milligan,et al.  Large-Scale Wind Integration Studies in the United States: Preliminary Results , 2009 .

[9]  W.L. Kling,et al.  Impacts of Wind Power on Thermal Generation Unit Commitment and Dispatch , 2007, IEEE Transactions on Energy Conversion.

[10]  G. R. Drayton-Bright Coordinating energy and reserves in a wholesale electricity market. , 1997 .

[11]  Evangelos Tzimas,et al.  Challenges and options for a large wind power uptake by the European electricity system , 2011 .

[12]  Michael Milligan,et al.  Design and operation of power systems with large amounts of wind power : Final report, Phase one 2006-08, IEA WIND Task 25 , 2009 .

[13]  Gerald B. Sheblé,et al.  Unit commitment literature synopsis , 1994 .

[14]  Michael Milligan,et al.  Operating Reserves and Wind Power Integration: An International Comparison , 2010 .

[15]  Brian Ó Gallachóir,et al.  Fossil fuel and CO2 emissions savings on a high renewable electricity system: A single year case study for Ireland , 2015 .

[16]  Mark O'Malley,et al.  A flexible power system operations simulation model for assessing wind integration , 2011, 2011 IEEE Power and Energy Society General Meeting.

[17]  Ross Baldick,et al.  The generalized unit commitment problem , 1995 .

[18]  Erik Ela,et al.  The evolution of wind power integration studies: Past, present, and future , 2009, 2009 IEEE Power & Energy Society General Meeting.

[19]  C. R. Philbrick Wind integration and the need for advanced decision support tools , 2011, 2011 IEEE Power and Energy Society General Meeting.

[20]  Michael Milligan,et al.  Grid Impacts of Wind Power Variability: Recent Assessments from a Variety of Utilities in the United States; Preprint , 2006 .

[21]  G. Drayton,et al.  Transmission expansion planning in the Western interconnection-the planning process and the analytical tools that will be needed to do the job , 2004, IEEE PES Power Systems Conference and Exposition, 2004..