Joint Utility Purchasing: A Case Study Lane Electric Cooperative
暂无分享,去创建一个
One method rural electric systems are using to reduce costs and improve service and competitive positions is to utilize joint purchasing agreements with other utilities. Through two examples, our author illustrates that the key to effective purchasing is to analyze and understand the cost drivers for the particular inventory item under examination. The threat of competition is forcing utilities to change, doing things today better than we did them yesterday so that we will be around tomorrow. One way that Lane Electric Cooperative (LEC) is controlling costs is through cooperation. LEC is involved with two purchasing groups: one for distribution transformers and one for 15 KV underground primary cable. The cable buying group consist of four cooperatives and two municipal system, whereas the transformer buying group consists of three cooperatives, four municipal systems, and four People's Utility Districts (PUDs). The common thread of the buying groups is public power agencies working together in order to lower costs and improve quality of service. CABLE BUYING GROUP The process for the cable buying group began by coming up with a common specification for two standard wire sizes. The largest municipal system formed a task force to evaluate the EPR (Ethylene Propylene Rubber) vs. TRXLOPE (Tree-Retardant Cross-Linked Polyethylene) insulations. Due to so many problems with our present cable, an economic evaluation based on a 40-year life looked at expected cable life, energy costs, cable purchase cost, labor installation costs, and costs to locate and repair cable faults. This thorough study resulted in an EPR insulation specification for 1/0 and 750 aluminum. Okonite was the successful bidder based on cost and their ability to meet the service requirements of the contract. With completion of the specification, each utility forecasted their annual usage for each wire size of the first year of a three-year bid. Each subsequent year's usage would be forecasted by November of the preceding year. The idea was to offer a quantity in a bid to a manufacturer that was large enough for them to offer a lower price. Once a given cable is chosen, the largest cost driver is volume. For example, even though no individual utility forecasted using over 100,000 feet in 1994, the total cable purchased by the group totalled over 500,000 feet. LEC realized a savings of 25%, totalling approximately $100,000. Cost savings are related to cable volume. The savings top out at around 250,000 feet so our group has not allowed other utilities to join our group, but suggests that they form their own group in order to take advantage of cost savings. The additional operational benefits from the cable buying group includes the ability to borrow or buy material from a neighboring utility in a pinch and know that it is identical material to standard stock such as splices and terminations knowing our tools are going to fit. The Okonite company provides technical training to each utility's line crews on the proper handling, and cable Preparation for termination. The Okonite service center is able to stock an emergency inventory specifically for the group. This was critical for LEC in 1994 when a couple of unexpected projects were completed resulting in the utility using over twice as much cable as forecasted. Okonite was able to met LEC needs and the projects were not delayed due to not having any cable available. The cable buying group meets quarterly (usually two hours plus a lunch) to update our next quarter's forecasts and to discuss mutual concerns such as recent research in the cable industry. Every utility and the supplier contributes to the agenda. TRANSFORMER BUYING GROUP A common transformer specification was not possible due to different system voltages and different accessories. However, a common loss formula was agreed to in hopes that a common core and coil assembly would provide a volume. …