Mapping the Causes of Time, Cost Overruns and Quality Shortfall in Egyptian Public Highway Projects

Transportation infrastructure development specifically public highway projects remains a major tool for achieving the aspirations of the newly introduced economic principles of the Government of Egypt. However, the importance of this industry and its impact on the national economy, concerns are raised frequently on the poor performances of these projects in terms of time, cost, and quality which directly subjected the construction of these projects to schedule delay, cost overrun, and quality shortfall problems. The main objective of the current study is to identify the causal causes of theses overruns in the public highway projects in Egypt. Using a detailed literature review and questionnaire surveys, the results of the study confirmed the prevalence of schedule delay, cost escalation, and quality shortfall in public highway projects in Egypt. Furthermore, the study establishes that contractor’s technical staff is insufficient and ineligible to accomplish the project, lack of communication between the construction parties, and unavailability of experienced staff in the owner’s and contractor’s teams during the project execution are the major factors responsible for causing schedule delay, cost overrun, and quality shortfall respectively. In addition, recommendations for avoiding and overcoming the negative implications of these factors on the performance of the public highway projects in Egypt have been emphasized.

[2]  N. Mansfield,et al.  Causes of delay and cost overruns in Nigerian construction projects , 1994 .

[3]  Min-Jae Lee,et al.  Performance-based value engineering application to public highway construction , 2010 .

[4]  Saad El-Hamrawy,et al.  The Iron Triangle of Projects Management: Quality, Schedule and Cost of Road Infrastructure Projects in Egypt , 2017 .

[5]  Ahmed Ebrahim Abu El-Maaty,et al.  A Circular Framework for Evaluating Highway Construction Projects Success: AHP Approach , 2016 .

[6]  Chabota Kaliba,et al.  Cost escalation and schedule delays in road construction projects in Zambia , 2009 .

[7]  Ahmed Ebrahim Abu El-Maaty,et al.  Fuzzy Assessment of Factors Influencing Quality Level of Highway Projects , 2016 .

[9]  Rehab Abdulmahdi Mohsin Hasan,et al.  An Investigation Into the Delays in Road Projects in Bahrain , 2014 .

[10]  Mohamad Sayed Abdul-Hamid Al-Hassan Factors affecting quality of pavement construction in Saudi Arabia , 1993 .

[11]  Abdulaziz A. Bubshait,et al.  Quality of Pavement Construction in Saudi Arabia , 2001 .

[12]  Nakhon Kokkaew,et al.  Green assessment of Thailand’s highway infrastructure: A Green Growth Index approach , 2017 .

[13]  A. Thorpe,et al.  A survey of indirect cost estimating in practice , 1994 .

[14]  Fazil T. Najafi,et al.  Cost and time overruns in highway construction , 2002 .

[15]  Y. C. Kog,et al.  Critical Success Factors for Different Project Objectives , 1999 .

[16]  Valentinas Podvezko,et al.  Identification and evaluation of the critical success factors for construction projects in Lithuania: AHP approach , 2014 .

[17]  Msafiri Atibu Seboru,et al.  An Investigation into Factors Causing Delays in Road Construction Projects in Kenya , 2015 .

[18]  Mohammad Hossein Fallahnejad,et al.  Delay causes in Iran gas pipeline projects , 2013 .

[19]  S Meeampol,et al.  Factors affecting cost and time performance on highway construction projects: Evidence from Thailand , 2006 .

[20]  David A. Mfinanga,et al.  Effect of Inadequate Design on Cost and Time Overrun of Road Construction Projects in Tanzania , 2014 .

[21]  Heinz F. Thurner Quality Assurance and Self Control in Road Construction Advanced Measurement Technology , 2001 .

[22]  Ahmed Ebrahim Abu El-Maaty,et al.  Success Factors of Highway Construction Projects in Egypt: AHP Approach , 2016 .