Evaluation of selected lightweight curtain wall solutions using multi criteria analysis
暂无分享,去创建一个
[1] Mária Kozlovská,et al. Survey of Construction Management Documentation Usage in Planning and Construction of Building Project , 2016 .
[2] T. Hanák. Electronic Reverse Auctions in Public Construction Procurement – Empirical Evidence from the Czech Republic , 2016 .
[3] Michał Juszczyk,et al. Application of committees of neural networks for conceptual cost estimation of residential buildings , 2015 .
[4] Krzysztof Zima,et al. Evaluation of Planned Construction Projects Using Fuzzy Logic , 2017 .
[5] Agnieszka Leśniak,et al. Construction Delays in Clients Opinion – Multivariate Statistical Analysis , 2015 .
[6] William Dudley Hunt. The contemporary curtain wall: its design, fabrication, and erection , 1958 .
[7] Edyta Plebankiewicz,et al. Estimation Of Task Completion Times With The Use Of The PERT Method On The Example Of A Real Construction Project , 2015 .
[8] B. Hoła. Identification and evaluation of processes in a construction enterprise , 2015 .
[9] Edyta Plebankiewicz,et al. Life Cycle Cost Modelling of Buildings with Consideration of the Risk , 2016 .