Mapping CMMI and RUP Process Frameworks for the Context of Elaborating Software Project Proposals
暂无分享,去创建一个
Rick Kazman | Pedro Ribeiro | Ricardo J. Machado | Ana Lima | Paula Monteiro | Cláudia Simões | R. J. Machado | R. Kazman | Pedro Ribeiro | Ana Lima | Paula Monteiro | C. Simões
[1] P. Pete Chong,et al. Software engineering education: A study on conducting collaborative senior project development , 2011, J. Syst. Softw..
[2] Alex Voss,et al. Agile Project Management: A Case Study of a Virtual Research Environment Development Project , 2011, Computer Supported Cooperative Work (CSCW).
[3] Brian Gallagher,et al. The Rational Unified Process and the Capability Maturity Model - Integrated Systems/Software Engineering , 2001 .
[4] Ricardo J. Machado,et al. Tailoring RUP to Small Software Development Teams , 2011, 2011 37th EUROMICRO Conference on Software Engineering and Advanced Applications.
[5] Ricardo J. Machado,et al. Mapping RUP Roles to Small Software Development Teams , 2012, SWQD.
[6] Philippe Kruchten,et al. The Rational Unified Process: An Introduction , 1998 .
[7] Mary Beth Chrissis,et al. CMMI(R): Guidelines for Process Integration and Product Improvement (2nd Edition) (The SEI Series in Software Engineering) , 2006 .
[8] Pedro Ribeiro,et al. A reduced set of RUP roles to small software development teams , 2012, 2012 International Conference on Software and System Process (ICSSP).
[9] Alan Gillies,et al. Software Quality , 1993 .
[10] Carme Quer,et al. Supporting CMMI Level 2 SAM PA with Non-technical Features Catalogues , 2008 .
[11] Kathy Schwalbe,et al. Information Technology Project Management , 1999 .
[12] Karl Kurbel. Developing Information Systems , 2008 .
[13] Karl Kurbel. The Making of Information Systems , 2008 .
[14] Jack T. Marchewka,et al. Information Technology Project Management , 2002 .
[15] D. Steer,et al. Spherical collapse in chameleon models , 2010, 1005.2051.
[16] Rick Kazman,et al. Inception of Software Validation and Verification Practices within CMMI Level 2 , 2009, 2009 Fourth International Conference on Software Engineering Advances.
[17] Roberto Tom Price,et al. Identifying Extensions Required by RUP (Rational Unified Process) to Comply with CMM (Capability Maturity Model) Levels 2 and 3 , 2003, IEEE Trans. Software Eng..
[18] Richard Turner,et al. CMMI Distilled: A Practical Introduction to Integrated Process Improvement , 2001 .
[19] Didar Zowghi,et al. Critical success factors for software process improvement implementation: an empirical study , 2006, Softw. Process. Improv. Pract..