Conditions for Ramp Rates Causing Uplift

The increasing penetration of renewable energy leads to more demand for ramping capabilities. As a result, the ramp rate constraints of generators are binding more often than before. Ramp rate constraints cause uplift in some market designs, which distorts the price signal. This paper studies the relationship between ramp rate constraints and uplift from two aspects: market design and the convexity of ramp rate constraints. The market designs compared are real-time market with single-period model and price clearing, multi-interval realtime market (MIRTM) with only the first interval financially binding, and MIRTM with all intervals financially binding. Using a simplified multi-interval economic dispatch model, it was proved that with the last market design, constant ramp rates neither cause lost opportunity cost nor make-whole payments. It was shown that dispatch-dependent ramp rates could cause uplift with a numerical example.

[1]  Jinye Zhao,et al.  A Multi-Period Market Design for Markets With Intertemporal Constraints , 2018, IEEE Transactions on Power Systems.

[2]  Tongxin Zheng,et al.  Modeling MW-dependent ramp rate in the electricity market , 2014, 2014 IEEE PES General Meeting | Conference & Exposition.

[3]  Ross Baldick,et al.  Pricing in Multi-Interval Real-Time Markets , 2019, IEEE Transactions on Power Systems.

[4]  S. Stoft Power System Economics: Designing Markets for Electricity , 2002 .

[5]  Tongxin Zheng,et al.  Convex Hull Pricing in Electricity Markets: Formulation, Analysis, and Implementation Challenges , 2016, IEEE Transactions on Power Systems.

[6]  Peter B. Luh,et al.  Effective modeling and resolution of generation-dependent ramp rates for unit commitment , 2017, 2017 IEEE Power & Energy Society General Meeting.

[7]  Mark O'Malley,et al.  Scheduling and Pricing for Expected Ramp Capability in Real-Time Power Markets , 2016, IEEE Transactions on Power Systems.