Integrated transmission and storage systems investment planning hosting wind power generation: continuous-time hybrid stochastic/robust optimisation

In this study, a continuous-time hybrid stochastic/robust optimisation is proposed for the integrated investment in transmission lines (TLs) and energy storage systems (ESSs) with high penetration of uncertain wind power generation (WPG) sources from a central planner viewpoint. The main objective of the problem is to achieve a simultaneous expansion of transmission assets, TLs and ESSs, whereas minimising the investment cost while taking the operational aspects of a power system into account to accommodate higher shares of uncertain and intermittent WPGs. However, the integrated expansion planning of joint TL and ESS to integrate WPGs via conventional hourly discrete time model can increase the operation cost and result in a non-optimal sizing and siting of TLs and ESSs, hence, can impose an opposite effect on the favourite. Accordingly, a continuous-time model is proposed to coordinate the expansion planning of both TL and ESS to deal with sub-hourly uncertainty of WPGs. Also, the WPG uncertainty in expansion planning problem is characterised using a hybrid stochastic/robust optimisation framework. Numerical tests are implemented on a modified IEEE RTS 24-bus system and the achieved results confirm the efficiency of the proposed model.

[1]  Xu Andy Sun,et al.  Adaptive Robust Optimization for the Security Constrained Unit Commitment Problem , 2013, IEEE Transactions on Power Systems.

[2]  Natalia Alguacil,et al.  On the Solution of Large-Scale Robust Transmission Network Expansion Planning Under Uncertain Demand and Generation Capacity , 2016, IEEE Transactions on Power Systems.

[3]  Daniel S. Kirschen,et al.  Stochastic Multistage Coplanning of Transmission Expansion and Energy Storage , 2017, IEEE Transactions on Power Systems.

[4]  Shengwei Mei,et al.  Robust Coordinated Transmission and Generation Expansion Planning Considering Ramping Requirements and Construction Periods , 2016, IEEE Transactions on Power Systems.

[5]  Long Zhao,et al.  Solving two-stage robust optimization problems using a column-and-constraint generation method , 2013, Oper. Res. Lett..

[6]  Nima Amjady,et al.  Robust Transmission and Energy Storage Expansion Planning in Wind Farm-Integrated Power Systems Considering Transmission Switching , 2016, IEEE Transactions on Sustainable Energy.

[7]  C. Y. Chung,et al.  Stochastic Transmission Expansion Planning Considering Uncertain Dynamic Thermal Rating of Overhead Lines , 2019, IEEE Transactions on Power Systems.

[8]  R. A. Jabr,et al.  Robust Transmission Network Expansion Planning With Uncertain Renewable Generation and Loads , 2013, IEEE Transactions on Power Systems.

[9]  Antonio J. Conejo,et al.  Robust transmission expansion planning , 2015, Eur. J. Oper. Res..

[10]  Antonio J. Conejo,et al.  Long-term coordination of transmission and storage to integrate wind power , 2017 .

[11]  Mohammad Shahidehpour,et al.  The IEEE Reliability Test System-1996. A report prepared by the Reliability Test System Task Force of the Application of Probability Methods Subcommittee , 1999 .

[12]  Chanan Singh,et al.  Optimal Wind Farm Allocation in Multi-Area Power Systems Using Distributionally Robust Optimization Approach , 2018, IEEE Transactions on Power Systems.

[13]  J. Contreras,et al.  Transmission Expansion Planning in Electricity Markets , 2008, IEEE Transactions on Power Systems.