Approximate formulae for the assessment of the long-term economic impact of environmental constraints on hydropeaking

The establishment of more severe hydrological environmental constraints, usually minimum flows and maximum ramping rates, on hydropower operation is a growing trend in the world. This paper presents the results of an attempt to assess the long-term economic impact of the above-mentioned constraints by three approximate formulae which quantify their effects, both separately and jointly, on a hydropower plant characterised by two parameters. The formulae are the result of three regression models developed from the solutions of 476 deterministic long-term hydro-scheduling problems corresponding to ten hydropower plants located in Spain. They were tested with 98 additional problems corresponding to two other Spanish hydropower plants. The formulae have a final average relative error of 8.2% and a final relative error of 19% with a confidence interval of 95%. This paper also offers some insight about the difficulties for tracking the energy prices when these constraints are present. Finally, the analysis of the hourly results indicates some additional effects of these constraints on hydropower operation related to the energy generated by the plant, the amount of water spilled from the reservoir, and the number of operating hours and of start-ups and shut-downs of the hydro units.

[1]  Jose M. Pinto,et al.  A bilevel decomposition technique for the optimal planning of offshore platforms , 2006 .

[2]  Antonio J. Conejo,et al.  Self-Scheduling of a Hydro Producer in a Pool-Based Electricity Market , 2002, IEEE Power Engineering Review.

[3]  J. J. S. Donaire,et al.  Aspectos geográficos de las distribuciones estadísticas ajustadas a las series temporales rellenadas de totales anuales de precipitación española , 2001 .

[4]  Zhibin Wu,et al.  Predicting and optimization of energy consumption using system dynamics-fuzzy multiple objective programming in world heritage areas , 2013 .

[5]  R. N. Walters,et al.  Selecting hydraulic reaction turbines , 1976 .

[6]  O. Nilsson,et al.  Hydro unit start-up costs and their impact on the short term scheduling strategies of Swedish power producers , 1997 .

[7]  Juan I. Pérez-Díaz,et al.  Assessment of the economic impact of environmental constraints on short-term hydropower plant operation , 2010 .

[8]  Lea-Rachel D. Kosnik,et al.  Balancing Environmental Protection and Energy Production in the Federal Hydropower Licensing Process , 2008, Land Economics.

[9]  Karin M. Krchnak,et al.  Integrating environmental flows into hydropower dam planning, design, and operations , 2009 .

[10]  Juan I. Pérez-Díaz,et al.  Effects of the maximum flow ramping rates on the long-term operation decisions of a hydropower plant , 2014 .

[11]  A. Borghetti,et al.  An MILP Approach for Short-Term Hydro Scheduling and Unit Commitment With Head-Dependent Reservoir , 2008, IEEE Transactions on Power Systems.

[12]  M. Insley,et al.  On the economics of ramping rate restrictions at hydro power plants: Balancing profitability and environmental costs☆ , 2013 .

[13]  Rodrigo Palma-Behnke,et al.  A framework to identify Pareto‐efficient subdaily environmental flow constraints on hydropower reservoirs using a grid‐wide power dispatch model , 2015 .

[14]  M. Olivares Optimal Hydropower Reservoir Operation with Environmental Requirements , 2008 .

[15]  A. Solera,et al.  IMPLEMENTING ENVIRONMENTAL FLOWS IN COMPLEX WATER RESOURCES SYSTEMS – CASE STUDY: THE DUERO RIVER BASIN, SPAIN , 2013 .

[16]  A.J. Conejo,et al.  Modeling of start-up and shut-down power trajectories of thermal units , 2004, IEEE Transactions on Power Systems.

[17]  Giovanni Battista Rossi Toward an Interdisciplinary Probabilistic Theory of Measurement , 2012, IEEE Transactions on Instrumentation and Measurement.

[18]  David A. Harpman Assessing the Short-Run Economic Cost of Environmental Constraints on Hydropower Operations at Glen Canyon Dam , 1999 .

[19]  Serge Trussart,et al.  Hydropower projects: a review of most effective mitigation measures , 2002 .

[20]  N. Crossman,et al.  Environmental flows for natural, hybrid and novel riverine ecosystems in a changing world , 2014 .

[21]  D. E. Rheinheimer,et al.  HYDROPOWER COSTS OF ENVIRONMENTAL FLOWS AND CLIMATE WARMING IN CALIFORNIA'S UPPER YUBA RIVER WATERSHED , 2013 .

[22]  J Haas,et al.  Grid-wide subdaily hydrologic alteration under massive wind power penetration in Chile. , 2015, Journal of environmental management.

[23]  Fred Schweppe,et al.  Homeostatic Utility Control , 1980, IEEE Transactions on Power Apparatus and Systems.

[24]  Norberto Fueyo,et al.  Spanish energy roadmap to 2020: Socioeconomic implications of renewable targets. , 2011 .

[25]  T. D. Veselka,et al.  Impacts of Western Area Power Administration`s power marketing alternatives on electric utility systems , 1995 .

[26]  M. Piekutowski,et al.  Optimal short-term scheduling for a large-scale cascaded hydro system , 1993 .

[27]  Richard N. Palmer,et al.  Reservoir Management Optimization for Basin-Wide Ecological Restoration in the Connecticut River , 2014 .