Algorithms for grouping machining operations and planning workpiece location under dynamic machining conditions
暂无分享,去创建一个
[1] Yoke San Wong,et al. Off-line modelling and planning of optimal clamping forces for an intelligent fixturing system , 1999 .
[2] Jerry Y. H. Fuh,et al. The development of an integrated and intelligent CAD/CAPP/CAFP environment using logic-based reasoning , 1996, Comput. Aided Des..
[3] Warren R. DeVries,et al. Optimization Methods Applied to Selecting Support Positions in Fixture Design , 1991 .
[4] Q. A. Sayeed,et al. Machining fixture design and analysis software , 1994 .
[5] Rajit Gadh,et al. Feature-based approach for set-up minimization of process design from product design , 1996, Comput. Aided Des..
[6] Yiming Rong,et al. Machining Accuracy Analysis for Computer-Aided Fixture Design , 1996 .
[7] Yiming Rong,et al. Automated modular fixture planning: Accuracy, clamping, and accessibility analyses , 1998 .
[8] Jonathan W. Lee,et al. Finite-Element Analysis of Flexible Fixturing System , 1987 .
[9] Utpal Roy,et al. Fixture design synthesis for a flexible manufacturing system , 1997 .
[10] Samuel H. Huang,et al. Tolerance analysis in setup planning for rotational parts , 1996 .
[11] M. M. Barash,et al. A Mathematical Approach to Automatic Configuration of Machining Fixtures: Analysis and Synthesis , 1989 .
[12] Zone-Ching Lin,et al. The application of the simulated annealing method and heuristic algorithms in the selection of fixture elements , 1997 .
[13] T.-C. Chang,et al. Automated setup selection in feature-based process planning , 1998 .
[14] Andrew Y. C. Nee,et al. Automatic generation of dynamic clamping forces for machining fixtures , 1999 .
[15] Hong-Chao Zhang,et al. Computer Aided Process Planning: the state-of-the-art survey , 1989 .
[16] Andrew Y. C. Nee,et al. An intelligent fixture with a dynamic clamping scheme , 2000 .
[17] Y.J.Gene Liao,et al. Flexible multibody dynamics based fixture-workpiece analysis model for fixturing stability , 2000 .
[18] Yiming Rong,et al. Development of Automated Fixture Planning Systems , 1999 .
[19] A. de Sam Lazaro,et al. Process and Tolerance Considerations in the Automated Design of Fixtures , 1994 .
[20] Yiming Rong,et al. Automated modular fixture planning: Geometric analysis , 1998 .
[21] M. Y. Yang,et al. A feature modification framework for the generation of alternative process plans , 1998 .
[22] Hong-Chao Zhang,et al. A hybrid-graph approach for automated setup planning in CAPP , 1999 .
[23] Frank W. Liou,et al. Fixture analysis under dynamic machining , 1997 .
[24] Edward C. De Meter,et al. Fast support layout optimization , 1998 .
[25] Necmettin Kaya,et al. Machining features and algorithms for set-up planning and fixture design , 1996 .
[26] Steven Y. Liang,et al. Analysis of Reactions and Minimum Clamping Force for Machining Fixtures with Large Contact Areas , 2000 .
[27] Andrew Y. C. Nee,et al. An approach to automating modular fixture design and assembly , 1997 .
[28] Andrew Kusiak,et al. Computer-aided fixture design : a review , 1994 .
[29] Horris C. Leung,et al. Annotated bibliography on computer-aided process planning , 1996 .
[30] H. Harry Asada,et al. Kinematic analysis of workpart fixturing for flexible assembly with automatically reconfigurable fixtures , 1985, IEEE J. Robotics Autom..
[31] Utpal Roy,et al. Application of a blackboard framework to a cooperative fixture design system , 1998 .
[32] Lucy Siu-Bik King,et al. Theoretical approach for generating optimal fixturing locations for prismatic workparts in automated assembly , 1993 .
[33] K F Gill,et al. A CAD-based approach to the design of fixtures for prismatic parts , 1997 .
[34] Yiming Rong,et al. Automated Generation of Fixture Configuration Design , 1997 .
[35] Angappa Gunasekaran,et al. Computer-aided process planning: A state of art , 1998 .