The Cost Drivers of Infrastructure Projects: Definition, Classification, and Conceptualization

[1]  G. Locatelli,et al.  Modern Slavery in Projects: A Systematic Literature Review and Research Agenda , 2023, Project Management Journal.

[2]  M. Çıdık,et al.  Project value as practice: Interactive valuation practices in architectural design projects , 2022, International Journal of Project Management.

[3]  Aaron M. Costin,et al.  BIM and Digital Tools for State-of-the-Art Construction Cost Management , 2022, Buildings.

[4]  P. Morris A working account of the rise of project management , 2022, International Journal of Project Management.

[5]  J. Rodney Turner Using Principal–Steward Contracting and Scenario Planning to Manage Megaprojects , 2021, Project Management Journal.

[6]  Linlin Zhao,et al.  Investigating the Causal Relationships between Project Complexities and Project Cost: An Empirical Study from New Zealand , 2021, Advances in Civil Engineering.

[7]  G. Locatelli,et al.  What does it take to kill a megaproject? The reverse escalation of commitment , 2021, International Journal of Project Management.

[8]  S. Ogunlana,et al.  Key driving factors of cost overrun in highway infrastructure projects in Nigeria: a context-based perspective , 2021, Journal of Engineering, Design and Technology.

[9]  I. Odesola,et al.  Agenda for first costs reduction in sustainable buildings for emerging markets , 2021 .

[10]  Alberto De Marco,et al.  Factors of Schedule and Cost Performance of Tunnel Construction Megaprojects , 2021 .

[11]  A. Krupnick,et al.  Decommissioning Orphaned and Abandoned Oil and Gas Wells: New Estimates and Cost Drivers. , 2021, Environmental science & technology.

[12]  N. Gil,et al.  MEGAPROJECT PERFORMANCE, VALUE CREATION AND VALUE DISTRIBUTION: AN ORGANIZATIONAL GOVERNANCE PERSPECTIVE , 2021 .

[13]  M. Shafiee,et al.  An economic assessment framework for decommissioning of offshore wind farms using a cost breakdown structure , 2021, The International Journal of Life Cycle Assessment.

[14]  Giorgio Locatelli,et al.  Qualitative comparative analysis as a method for project studies: The case of energy infrastructure , 2020, Renewable and Sustainable Energy Reviews.

[15]  Harish Hirani,et al.  Identification and classification of change causes and effects in construction projects , 2020, International Journal of Construction Management.

[16]  Kimberly D. Elsbach,et al.  Creating High‐Impact Literature Reviews: An Argument for ‘Integrative Reviews’ , 2020 .

[17]  Giorgio Locatelli,et al.  Characterising nuclear decommissioning projects: an investigation of the project characteristics that affect the project performance , 2020, Construction Management and Economics.

[18]  Corinne Post,et al.  Advancing Theory with Review Articles , 2020 .

[19]  I. Krystallis,et al.  What Are the Causes and Cures of Poor Megaproject Performance? A Systematic Literature Review and Research Agenda , 2020, Project Management Journal.

[20]  Hannah Snyder,et al.  Literature review as a research methodology: An overview and guidelines , 2019, Journal of Business Research.

[21]  S. Whitty,et al.  The five modes of comportment for project managing: Disclosing the tacit in project work , 2019, International Journal of Project Management.

[22]  Naomi J. Brookes,et al.  An exploration of the relationship between nuclear decommissioning projects characteristics and cost performance , 2019, Progress in Nuclear Energy.

[23]  Søren L. Buhl,et al.  Five Things You Should Know about Cost Overrun , 2018, Transportation Research Part A: Policy and Practice.

[24]  Reshma Mary Johnson,et al.  Time and cost overruns in the UAE construction industry: a critical analysis , 2018, International Journal of Construction Management.

[25]  Sherif Mostafa,et al.  Leagile Strategies for Optimizing the Delivery of Prefabricated House Building Projects , 2018, International Journal of Construction Management.

[26]  Kumar Neeraj Jha,et al.  Critical factors affecting cost performance: a case of Ethiopian public construction projects , 2018 .

[27]  Jeffrey Boon Hui Yap,et al.  Collaborative model: Managing design changes with reusable project experiences through project learning and effective communication , 2017 .

[28]  Naomi J. Brookes,et al.  Managing social challenges in the nuclear decommissioning industry: A responsible approach towards better performance , 2017 .

[29]  Naomi J. Brookes,et al.  How Benchmarking Can Support the Selection, Planning and Delivery of Nuclear Decommissioning Projects , 2017 .

[30]  M. Kaiser FERC pipeline decommissioning cost in the U.S. Gulf of Mexico, 1995–2015 , 2017 .

[31]  Jasper Mbachu,et al.  Exploratory Factors Influencing Building Development Costs in New Zealand , 2017 .

[32]  Z. Irani,et al.  Cost performance of public infrastructure projects: the nemesis and nirvana of change-orders , 2017 .

[33]  Nadeem Ehsan,et al.  Quantification of Project Execution Complexity and its Effect on Performance of Infrastructure Development Projects , 2017 .

[34]  Bernard Kamsu-Foguem,et al.  BIM – New rules of measurement ontology for construction cost estimation , 2017 .

[35]  Giorgio Locatelli,et al.  Corruption in Public projects and Megaprojects: There is an elephant in the room! , 2017 .

[36]  Giorgio Locatelli,et al.  Project characteristics and performance in Europe: An empirical analysis for large transport infrastructure projects , 2017 .

[37]  Rafaela Alfalla-Luque,et al.  Risk Identification in Megaprojects as a Crucial Phase of Risk Management: A Literature Review , 2016 .

[38]  R. Torraco Writing Integrative Literature Reviews , 2016 .

[39]  Ole Jonny Klakegg,et al.  Challenges in Cost Estimation under Uncertainty—A Case Study of the Decommissioning of Barsebäck Nuclear Power Plant , 2016 .

[40]  Milind Padalkar,et al.  Six decades of project management research: Thematic trends and future opportunities , 2016 .

[41]  Peter E.D. Love,et al.  Cost overruns in transportation infrastructure projects: Sowing the seeds for a probabilistic theory of causation , 2016 .

[42]  Herman Mooi,et al.  How do contract types and incentives matter to project performance , 2016 .

[43]  José M. Cardoso Teixeira,et al.  Cost overrun in construction projects in developing countries, Gas-Oil industry of Iran as a case study , 2016 .

[44]  Andrew Davies,et al.  Dynamic Capabilities in Complex Projects: The Case of London Heathrow Terminal 5 , 2016 .

[45]  P. Collier,et al.  The Cost of Road Infrastructure in Low and Middle Income Countries , 2015 .

[46]  Eric Asa,et al.  Estimating cost for transportation tunnel projects: a systematic literature review , 2015 .

[47]  Ming Sun,et al.  Construction project control in the UK: Current practice, existing problems and recommendations for future improvement , 2015 .

[48]  Giorgio Locatelli,et al.  Systems Engineering to improve the governance in complex project environments , 2014 .

[49]  Andrew Davies,et al.  Managing Structural and Dynamic Complexity: A Tale of Two Projects , 2014 .

[50]  Eugenio Pellicer,et al.  A method to estimate occupational health and safety costs in construction projects , 2014 .

[51]  A. Enshassi,et al.  Factors affecting cost contingency in the construction industry – Contractors' perspective , 2014 .

[52]  Ying-Mei Cheng,et al.  An exploration into cost-influencing factors on construction projects , 2014 .

[53]  Andrew Davies,et al.  Project Complexity and Systems Integration: Constructing the London 2012 Olympics and Paralympics Games , 2014 .

[54]  Jamie L. Callahan Writing Literature Reviews , 2014 .

[55]  Bo Xia,et al.  Examining the effects of early cost drivers on contingencies , 2014 .

[56]  Tyson R. Browning,et al.  A conceptual framework for tackling knowable unknown unknowns in project management , 2014 .

[57]  B. Flyvbjerg What you Should Know about Megaprojects and Why: An Overview , 2014, 1409.0003.

[58]  S. Tamer Cavusgil,et al.  Managing global megaprojects: Complexity and risk management , 2013 .

[59]  David Bryde,et al.  The project benefits of Building Information Modelling (BIM) , 2013 .

[60]  T. Greenhalgh,et al.  RAMESES publication standards: meta-narrative reviews. , 2013, Journal of advanced nursing.

[61]  M. Ramabodu,et al.  Factors that influence cost overruns in South African public sector mega-projects , 2013 .

[62]  Christophe Bredillet,et al.  Perspectives on research in project management: the nine schools , 2013 .

[63]  Ismail Abdul Rahman,et al.  Relationship between factors of construction resources affecting project cost , 2012 .

[64]  Florence Yean Yng Ling,et al.  Effects of interpersonal relations on public sector construction contracts in Vietnam , 2012 .

[65]  Xianhai Meng,et al.  The impact of incentive mechanisms on project performance , 2012 .

[66]  Tim Cockerill,et al.  The cost of offshore wind: Understanding the past and projecting the future , 2012 .

[67]  Allan D. Chasey,et al.  Comparison of Public–Private Partnerships and Traditional Procurement Methods in North American Highway Construction , 2012 .

[68]  Li-Ren Yang,et al.  The association among project manager's leadership style, teamwork and project success , 2011 .

[69]  M. Alvesson,et al.  Ways of constructing research questions: gap-spotting or problematization? , 2011 .

[70]  Anders Söderholm,et al.  Orchestrating deviations in global projects: Projects-as-practice observations , 2010 .

[71]  Jamie L. Callahan Constructing a Manuscript: Distinguishing Integrative Literature Reviews and Conceptual and Theory Articles , 2010 .

[72]  Ming Sun,et al.  Cost and time control of construction projects: inhibiting factors and mitigating measures in practice , 2010 .

[73]  Anders Söderholm,et al.  Project-as-Practice: In Search of Project Management Research that Matters , 2010, IEEE Engineering Management Review.

[74]  K. T. Odusami,et al.  The impact of contractors' management capability on cost and time performance of construction projects in Nigeria , 2009 .

[75]  Mohan M. Kumaraswamy,et al.  Delays and cost overruns in the construction projects in the Gaza Strip , 2009 .

[76]  Maria S. Plakhotnik,et al.  Literature Reviews, Conceptual Frameworks, and Theoretical Frameworks: Terms, Functions, and Distinctions , 2009 .

[77]  Nuno Gil,et al.  Introduction: Infrastructure Meets Business: Building New Bridges, Mending Old Ones , 2009 .

[78]  Andrew Davies,et al.  Innovation in Megaprojects: Systems Integration at London Heathrow Terminal 5 , 2009 .

[79]  Nuno Gil,et al.  Developing Cooperative Project Client-Supplier Relationships: How Much to Expect from Relational Contracts? , 2009 .

[80]  G. Anand,et al.  Benchmarking the benchmarking models , 2008 .

[81]  Ray R. Venkataraman,et al.  Cost and Value Management in Projects , 2008 .

[82]  Nannan Wang,et al.  CSI model for estimating road maintenance projects , 2007 .

[83]  Ming Xu,et al.  Comparative performance of PPPs and traditional procurement in Australia , 2007 .

[84]  A. A. Oladapo,et al.  A quantitative assessment of the cost and time impact of variation orders on construction projects , 2007 .

[85]  J. Thomas,et al.  Rethinking Project Management: Researching the actuality of projects , 2006 .

[86]  Kevin P. Grant,et al.  Delivering Projects On Time , 2006 .

[87]  Bent Flyvbjerg,et al.  From Nobel Prize to Project Management: Getting Risks Right , 2006, ArXiv.

[88]  Christoph H. Loch,et al.  Managing the Unknown: A New Approach to Managing High Uncertainty and Risk in Projects , 2006 .

[89]  R. Whittemore,et al.  The integrative review: updated methodology. , 2005, Journal of advanced nursing.

[90]  R. Torraco Writing Integrative Literature Reviews: Guidelines and Examples , 2005 .

[91]  N. Kartam,et al.  Delays and cost increases in the construction of private residential projects in Kuwait , 2005 .

[92]  Shih-Tong Lu,et al.  Statistical analysis of causes for change orders in metropolitan public works , 2004 .

[93]  Søren L. Buhl,et al.  What Causes Cost Overrun in Transport Infrastructure Projects? , 2004, 1304.4476.

[94]  Anthony P. Ammeter,et al.  Leadership, Team Building, and Team Member Characteristics in High Performance Project Teams , 2002 .

[95]  Søren L. Buhl,et al.  Underestimating Costs in Public Works Projects: Error or Lie? , 2002, 1303.6604.

[96]  Peter E.D. Love,et al.  Quantifying the causes and costs of rework in construction , 2000 .

[97]  Mohan M. Kumaraswamy,et al.  Evaluation of factors affecting Time and Cost performance in Hong Kong Building projects , 1999 .

[98]  R. Baumeister,et al.  Writing Narrative Literature Reviews , 1997, Review of General Psychology.

[99]  Aaron J. Shenhar,et al.  Toward a typological theory of project management , 1996 .

[100]  N. Mansfield,et al.  Causes of delay and cost overruns in Nigerian construction projects , 1994 .

[101]  P. Love,et al.  Error Mastery in Alliance Transport Megaprojects , 2022, IEEE Transactions on Engineering Management.

[102]  M. Yearworth,et al.  Understanding front-end project workshops with Social Practice Theory , 2019, International Journal of Project Management.

[103]  Chandrasekaran Balaji Venkateswaran,et al.  Time Delay and Cost Overrun of Road over Bridge (ROB) Construction Projects in India , 2017 .

[104]  Gary David Holt,et al.  Factors influencing construction time and cost overruns on high-rise projects in Indonesia , 1997 .