Analyzing the factors affecting coordination in engineer-to-order supply chain

Purpose – Engineer-to-order (ETO) supply chains involve multiple companies for performing complex projects. The ability to effectively coordinate cross-business activities is essential to avoid delays, cost overruns and quality problems. Coordination is related to a number of contingent factors that need to be better comprehended. The purpose of this paper is to highlight such contingent factors and to analyse their effect on the occurrence of project delays. Design/methodology/approach – A multiple case study is used to investigate the moderating factors affecting coordination in projects carried out in an ETO supply chain. Such factors are examined through a cross-analysis of six shipbuilding projects based on data from interviews, project documentation and clips from the media press. Findings – In ETO supply chains, the engineering and production activities involve mutual interdependences that need to be coordinated. The findings suggest that both the integration of engineering and production and the p...

[1]  Keith R. Molenaar,et al.  Concurrent Engineering Approach to Reducing Design Delivery Time , 2005 .

[2]  David N. Ford,et al.  Overcoming the 90% Syndrome: Iteration Management in Concurrent Development Projects , 2003, Concurr. Eng. Res. Appl..

[3]  Robert P. Smith,et al.  A predictive model of sequential iteration in engineering design , 1997 .

[4]  Paul S. Adler,et al.  Interdepartmental Interdependence and Coordination: The Case of the Design/Manufacturing Interface , 1995 .

[5]  A. Griffin,et al.  Patterns of Communication Among Marketing, Engineering and Manufacturing-A Comparison Between Two New Product Teams , 1992 .

[6]  Jack R. Meredith,et al.  Building operations management theory through case and field research , 1998 .

[7]  Sameer Kumar,et al.  Risk mitigation in offshoring of business operations , 2009 .

[8]  Iris D. Tommelein,et al.  REDUCING LEAD TIME FOR ELECTRICAL SWITCHGEAR , 2002 .

[9]  Jože Tavčar,et al.  Engineering change management in individual and mass production , 2005 .

[10]  Christopher Earl,et al.  A Typology of UK Engineer-to-Order Companies , 2001 .

[11]  Christopher Earl,et al.  Modelling supply chain management processes in engineer-to-order companies , 1999 .

[12]  Christoph H. Loch,et al.  Problem - Solving Oscillations in Complex Engineering Projects , 2003, Manag. Sci..

[13]  Jc Johan Wortmann,et al.  Customer-driven manufacturing , 1996 .

[14]  Jan Ola Strandhagen,et al.  Supply chain management in the shipbuilding industry: challenges and perspectives , 2011 .

[15]  Pa Paul Konijnendijk Coordinating marketing and manufacturing in ETO companies , 1994 .

[16]  S. Sarin,et al.  First Among Equals: The Effect of Team Leader Characteristics on the Internal Dynamics of Cross-Functional Product Development Teams , 2009 .

[17]  Yimin Zhu,et al.  An ontology-based approach to support decision-making for the design of ETO (Engineer-To-Order) products , 2007 .

[18]  Franco Caron,et al.  ‘Engineer to order’ companies: how to integrate manufacturing and innovative processes , 1995 .

[19]  David Z. Zhang,et al.  Towards theory building in agile manufacturing strategies--Case studies of an agility taxonomy , 2011 .

[20]  Kim B. Clark,et al.  Product development performance : strategy, organization, and management in the world auto industry / Kim B. Clark, Tahahiro Fujimoto , 1991 .

[21]  Viswanathan V Krishnan,et al.  Managing the simultaneous execution of coupled phases in concurrent product development , 1996 .

[22]  Alison Davis-Blake,et al.  Managing Interdependence: The Effects of Outsourcing Structure on the Performance of Complex Projects , 2008, Decis. Sci..

[23]  J. Ettlie Product-process development integration in manufacturing , 1995 .

[24]  David Twigg,et al.  Managing the design/manufacturing interface across firms , 2002 .

[25]  Powell E. Robinson,et al.  Flow Coordination and Information Sharing in Supply Chains: Review, Implications, and Directions for Future Research , 2002, Decis. Sci..

[26]  J. Daniel Sherman,et al.  Optimal modes and levels of integration, and the identification of cross-functional coordination deficiencies in concurrent engineering , 2004, IEEE Transactions on Engineering Management.

[27]  Christian Terwiesch,et al.  International product transfer and production ramp-up: a case study from the data storage industry , 2001 .

[28]  James D. Thompson Organizations in Action: Social Science Bases of Administrative Theory , 1967 .

[29]  Christopher A. Voss,et al.  Case research in operations management , 2002 .

[30]  Tobias Held Supplier Integration as an Improvement Driver – An Analysis of Some Recent Approaches in the Shipbuilding Industry , 2010 .

[31]  B. Kingsman,et al.  Competitive advantage, customisation and a new taxonomy for non make-to-stock companies , 1999 .

[32]  A. V. D. Ven,et al.  Determinants of Coordination Modes within Organizations , 1976 .

[33]  Jay R. Galbraith Designing Complex Organizations , 1973 .

[34]  R. Handfield,et al.  Supplier integration into new product development: coordinating product, process and supply chain design , 2005 .

[35]  Jan Ola Strandhagen,et al.  The role of coordination in avoiding project delays in an engineer-to-order supply chain , 2015 .

[36]  J. Bessant,et al.  The manufacturing strategy‐capabilities links in mass customisation and agile manufacturing – an exploratory study , 2003 .

[37]  Lenos Trigeorgis,et al.  It May Be Cheaper to Manufacture at Home , 2010 .

[38]  Jeffrey B. Schmidt,et al.  Antecedents and consequences of cross-functional cooperation: A comparison of R&D, manufacturing, and marketing perspectives , 1997 .

[39]  Christoph H. Loch,et al.  Exchanging Preliminary Information in Concurrent Engineering: Alternative Coordination Strategies , 2002, Organ. Sci..

[40]  Jean Hartley,et al.  Case study research , 2004 .

[41]  M. Naim,et al.  Engineer-to-order supply chain management: A literature review and research agenda , 2009 .

[42]  Kevin Crowston,et al.  The interdisciplinary study of coordination , 1994, CSUR.

[43]  Peter E.D. Love,et al.  Using systems dynamics to better understand change and rework in construction project management systems , 2002 .

[44]  O. Hauptman,et al.  The influence of process concurrency on project outcomes in product development: an empirical study of cross-functional teams , 1996 .

[45]  Anneke Vandevelde,et al.  Managing the design‐manufacturing interface , 2003 .

[46]  Mohamed A. Youssef Design for Manufacturability and Time‐to‐Market, Part 1: Theoretical Foundations , 1994 .

[47]  Euthemia Stavrulaki,et al.  Aligning products with supply chain processes and strategy , 2010 .

[48]  G. Lynn,et al.  Autonomous Teams and New Product Development , 2012 .

[49]  Sandra Valle,et al.  Concurrent engineering performance: Incremental versus radical innovation , 2009 .

[50]  Tom R. Burns,et al.  The Management of Innovation. , 1963 .

[51]  Christian Hicks,et al.  Supply chain management: A strategic issue in engineer to order manufacturing , 2000 .

[52]  P. Lawrence,et al.  Organization and Environment: Managing Differentiation and Integration , 1967 .

[53]  Young B. Moon,et al.  System dynamics modeling of engineering change management in a collaborative environment , 2011 .

[54]  Andrew R.J. Dainty,et al.  Construction supply chain integration: an elusive goal? , 2005 .