Integrated Simulation between Flexible Body of Catenary and Active Control Pantograph for Contact Force Variation Control

Railway transport has been developed for a variety of requirements with a diversity of studies and technologies in recent years. In particular, the intercity railway transport that can be operated at speed of more than 350 km/h is the goal for the railway industry. Due to vibration and drag forces at high speed, contact force variation occurs between pantograph and catenary. This variation also causes instability in the pantograph and catenary interaction. In this study, multibody dynamics analysis is used to model the catenary. The integration of the catenary model and the pantograph model in the simulation flow produces contact force variations. A sinusoidal feed forward force and a simple feedback control force are applied to control the wave-like contact force fluctuations by means of active dampers. Evaluation of the combination of active control forces will produce optimized forces that may be able to maintain, thus improve the contact force variations.

[1]  Wanming Zhai,et al.  Effect of Locomotive Vibrations on Pantograph-Catenary System Dynamics , 1998 .

[2]  Y. J. Huang,et al.  Discrete fuzzy variable structure control for pantograph position control , 2004 .

[3]  B. R. Davis,et al.  AN ACTIVE PANTOGRAPH WITH SHAPED FREQUENCY RESPONSE EMPLOYING LINEAR OUTPUT FEEDBACK CONTROL , 1990 .

[4]  Warren P. Seering,et al.  Active Control of a High-Speed Pantograph , 1997 .

[5]  W. Kortüm,et al.  Pantograph/Catenary Dynamics and Control , 1997 .

[6]  Lars Drugge,et al.  An Interactive Model of a Pantograph-Catenary System , 1996 .

[7]  Katsushi Manabe High-Speed Contact Performance of a Catenary-Pantograph System : An Experimental Study Using a Dynamically Scaled Model , 1989 .

[8]  Yohei Michitsuji,et al.  Swing-up Control of Mass Body Interlinked Tether , 2007 .

[9]  Alessandro Pisano,et al.  Output-feedback regulation of the contact-force in high-speed train pantographs , 2004 .

[10]  Jangbom Chai,et al.  Dynamic analysis of a pantograph–catenary system using absolute nodal coordinates , 2006 .

[11]  Ahmed A. Shabana,et al.  Dynamics of Multibody Systems , 2020 .

[12]  Martin Arnold,et al.  Pantograph and catenary dynamics: a benchmark problem and its numerical solution , 2000 .

[13]  Ahmed A. Shabana,et al.  Application of the Absolute Nodal Coordinate Formulation to Large Rotation and Large Deformation Problems , 1998 .

[14]  Kazuyoshi Nezu,et al.  Diagnosis of Overhead Contact Line based on Contact Force , 2006 .

[15]  Kazuo Yoshida,et al.  Running Test on Current Collector with Contact Force Controller for High-Speed Railways , 1997 .

[16]  R J Gostling,et al.  The Interaction of Pantograph and Overhead Equipment: Practical Applications of a New Theoretical Method , 1983 .

[17]  Tomomi Yagi,et al.  SIMULATION AND VISUALISATION OF THE DYNAMIC BEHAVIOUR OF AN OVERHEAD POWER SYSTEM WITH CONTACT BREAKING. , 1996 .

[18]  T. X. Wu,et al.  Basic Analytical Study of Pantograph-catenary System Dynamics , 1998 .