Stochastic modelling and optimum inspection and maintenance strategy for fatigue affected steel bridge members

This paper presents a method for stochastic modelling of fatigue crack growth and optimising inspection and maintenance strategy for the structural members of steel bridges. The fatigue crack evolution is considered as a stochastic process with uncertainties, and the Gamma process is adopted to simulate the propagation of fatigue crack in steel bridge members. From the stochastic modelling for fatigue crack growth, the probability of failure caused by fatigue is predicted over the service life of steel bridge members. The remaining fatigue life of steel bridge members is determined by comparing the fatigue crack length with its predetermined threshold. Furthermore, the probability of detection is adopted to consider the uncertainties in detecting fatigue crack by using existing damage detection techniques. A multi-objective optimisation problem is proposed and solved by a genetic algorithm to determine the optimised inspection and maintenance strategy for the fatigue affected steel bridge members. The optimised strategy is achieved by minimizing the life-cycle cost, including the inspection, maintenance and failure costs, and maximizing the service life after necessary intervention. The number of intervention during the service life is also taken into account to investigate the relationship between the service life and the cost for maintenance. The results from numerical examples show that the proposed method can provide a useful approach for cost-effective inspection and maintenance strategy for fatigue affected steel bridges.

[1]  Gerhart I. Schuëller,et al.  Design of maintenance schedules for fatigue-prone metallic components using reliability-based optimization , 2010 .

[2]  Jan M. van Noortwijk,et al.  A survey of the application of gamma processes in maintenance , 2009, Reliab. Eng. Syst. Saf..

[3]  J. W. Fisher,et al.  Fatigue of steel bridge infrastructure , 2011 .

[4]  L. Faravelli,et al.  Inherent variability of an experimental crack growth curve , 2007 .

[5]  Francesco Penta,et al.  A gamma process model for the analysis of fatigue crack growth data , 2015 .

[6]  Man-Chung Tang A new concept of orthotropic steel bridge deck , 2011 .

[7]  Hamouda Ghonem,et al.  Experimental study of the constant-probability crack growth curves under constant amplitude loading , 1987 .

[8]  P. Goel,et al.  The Statistical Nature of Fatigue Crack Propagation , 1979 .

[9]  Dan M. Frangopol,et al.  Life-cycle performance, management, and optimisation of structural systems under uncertainty: accomplishments and challenges 1 , 2011, Structures and Infrastructure Systems.

[10]  Huapeng Chen,et al.  Optimized Maintenance Strategy for Concrete Structures Affected by Cracking due to Reinforcement Corrosion , 2013 .

[11]  Dan M. Frangopol,et al.  Life-Cycle Management of Fatigue-Sensitive Structures Integrating Inspection Information , 2014 .

[12]  P. C. Paris,et al.  A Critical Analysis of Crack Propagation Laws , 1963 .

[13]  Dan M. Frangopol,et al.  Two probabilistic life-cycle maintenance models for deteriorating civil infrastructures , 2004 .

[14]  Dan M. Frangopol,et al.  Generalized Probabilistic Framework for Optimum Inspection and Maintenance Planning , 2013 .

[15]  Huapeng Chen,et al.  Stochastic modelling and lifecycle performance assessment of bond strength of corroded reinforcement in concrete , 2015 .

[16]  R. Forman,et al.  Numerical Analysis of Crack Propagation in Cyclic-Loaded Structures , 1967 .

[17]  André T. Beck,et al.  Stochastic fracture mechanics using polynomial chaos , 2013 .

[18]  Nan Xiao,et al.  Symptom-based reliability analyses and performance assessment of corroded reinforced concrete structures , 2015 .

[19]  B. F. Spencer,et al.  Stochastic approach to modeling fatigue crack growth , 1989 .

[20]  N. Limnios,et al.  Piecewise deterministic Markov processes applied to fatigue crack growth modelling , 2009 .

[21]  Wen-Fang Wu,et al.  Probabilistic models of fatigue crack propagation and their experimental verification , 2004 .

[22]  Dan M. Frangopol,et al.  Bridge fatigue assessment and management using reliability-based crack growth and probability of detection models , 2011 .

[23]  Dan M. Frangopol,et al.  Probabilistic optimum inspection planning of steel bridges with multiple fatigue sensitive details , 2013 .

[24]  S. D. Manning,et al.  A simple second order approximation for stochastic crack growth analysis , 1996 .

[25]  Tian-Li Huang,et al.  Updating finite element model using dynamic perturbation method and regularization algorithm , 2012 .

[26]  Steven C. Lovejoy Determining Appropriate Fatigue Inspection Intervals for Steel Bridge Members , 2003 .

[27]  André T. Beck,et al.  Optimal inspection planning and repair under random crack propagation , 2014 .

[28]  Karl H. Frank,et al.  Optimal inspection scheduling of steel bridges using nondestructive testing techniques , 2006 .