A Methodology for Measuring, Reporting, Navigating, and Analyzing Overall Equipment Productivity (OEP)
暂无分享,去创建一个
[1] J. Matthews,et al. Quantifying capacity loss associated with staffing in a semiconductor manufacturing line , 1998, IEEE/SEMI 1998 IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop (Cat. No.98CH36168).
[2] A. K. Erlang. The theory of probabilities and telephone conversations , 1909 .
[3] D. Martin,et al. How the law of unanticipated consequences can nullify the theory of constraints: The case for balanced capacity in a semiconductor manufacturing line , 1997, 1997 IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop ASMC 97 Proceedings.
[4] J D Littler,et al. A PROOF OF THE QUEUING FORMULA , 1961 .
[5] J. Little. A Proof for the Queuing Formula: L = λW , 1961 .