Sensitivity Analysis and Optimisation of Key Parameters for Railway Rigid Overhead System and Pantograph
暂无分享,去创建一个
Xiaobing Lu | Yang Song | F. Duan | Ke Chen
[1] Shibin Gao,et al. Static and Dynamic Analysis of Conductor Rail with Large Cross-Sectional Moment of Inertia in Rigid Catenary Systems , 2023, Energies.
[2] Yang Song,et al. Railway Pantograph-catenary Interaction Performance in an Overlap Section: Modelling, Validation and Analysis , 2022, Journal of Sound and Vibration.
[3] Yang Song,et al. Analysis of Critical Speed for High-Speed Railway Pantograph-Catenary System , 2022, IEEE Transactions on Vehicular Technology.
[4] G. Mei,et al. Optimisation of current collection quality of high-speed pantograph-catenary system using the combination of artificial neural network and genetic algorithm , 2022, Vehicle System Dynamics.
[5] Zhigang Liu,et al. Assessment of the Current Collection Quality of Pantograph–Catenary With Contact Line Height Variability in Electric Railways , 2022, IEEE Transactions on Transportation Electrification.
[6] Zhiwei Wang,et al. Modelling and Analysis of Power-Regenerating Potential for High-Speed Train Suspensions , 2022, Sustainability.
[7] Chen Wang,et al. High-Speed Rail Network Expansion and Its Impact on Regional Economic Sustainability in the Yangtze River Delta, China, 2009–2018 , 2021, Sustainability.
[8] P. Nåvik,et al. Geometry deviation effects of railway catenaries on pantograph–catenary interaction: a case study in Norwegian Railway System , 2021, Railway Engineering Science.
[9] Tarek Zayed,et al. A Hybrid Multi-Criteria Decision Making Model for Defect-Based Condition Assessment of Railway Infrastructure , 2021, Sustainability.
[10] Ruichen Wang,et al. A spatial coupling model to study dynamic performance of pantograph-catenary with vehicle-track excitation , 2021 .
[11] Zhigang Liu,et al. A methodology to study high-speed pantograph-catenary interaction with realistic contact wire irregularities , 2020, Mechanism and Machine Theory.
[12] Renata Stasiak-Betlejewska,et al. Sustainability of Railway Undertaking Services with Lean Philosophy in Risk Management—Case Study , 2020, Sustainability.
[13] Zhigang Liu,et al. Contact Wire Irregularity Stochastics and Effect on High-Speed Railway Pantograph–Catenary Interactions , 2020, IEEE Transactions on Instrumentation and Measurement.
[14] S. Kaewunruen,et al. Does High-Speed Rail Influence Urban Dynamics and Land Pricing? , 2020, Sustainability.
[15] Yang Song,et al. Study on Dynamic Interaction of Railway Pantograph–Catenary Including Reattachment Momentum Impact , 2020, Vibration.
[16] Jorge Ambrósio,et al. A new methodology to study the pantograph–catenary dynamics in curved railway tracks , 2019, Vehicle System Dynamics.
[17] David P Stoten,et al. Dynamically substructured testing of railway pantograph/catenary systems , 2018, Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit.
[18] Zhigang Liu,et al. Wave propagation analysis in high-speed railway catenary system subjected to a moving pantograph , 2018, Applied Mathematical Modelling.
[19] Ning Zhou,et al. Review of pantograph and catenary interaction , 2018 .
[20] Hongrui Wang,et al. Active control of contact force for high-speed railway pantograph-catenary based on multi-body pantograph model , 2017 .
[21] Petter Nåvik,et al. Variation in predicting pantograph–catenary interaction contact forces, numerical simulations and field measurements , 2017 .
[22] P. Pintado,et al. Dynamic interaction between pantograph and rigid overhead lines using a coupled FEM — multibody procedure , 2016 .
[23] Mitsuru Ikeda,et al. The results of the pantograph–catenary interaction benchmark , 2015 .
[24] Jorge Ambrósio,et al. Dynamic Analysis of the Pantograph-Cantenary, Interaction on Overlap Sections for High-Speed Railway Operations , 2014 .
[25] A. Carnicero,et al. Active control strategy on a catenary–pantograph validated model , 2013 .
[26] Tae Won Park,et al. Estimation of Dynamic Contact Force Between a Pantograph and Catenary Using the Finite Element Method , 2012 .
[27] Chih-Chieh Yang,et al. Robust Active Vibration Control for Rail Vehicle Pantograph , 2007, IEEE Transactions on Vehicular Technology.
[28] Pablo Rodríguez,et al. Simulation model for the study of overhead rail current collector systems dynamics, focused on the design of a new conductor rail , 2006 .
[29] Masatoshi Shimizu,et al. Improving Performance of Type T Overhead Rigid Conductor Lines , 2006 .
[30] Weihua Zhang,et al. A hybrid method to simulate the interaction of pantograph and catenary on overlap span , 2006 .
[31] I. Sobola,et al. Global sensitivity indices for nonlinear mathematical models and their Monte Carlo estimates , 2001 .
[32] Shibin Gao,et al. Crosswind Effects on Current Collection Quality of Railway Pantograph–Catenary: A Case Study in Chengdu–Chongqing Passenger Special Line , 2022, IEEE Transactions on Instrumentation and Measurement.
[33] Mingjie Zhang,et al. Wind deflection analysis of railway catenary under crosswind based on nonlinear finite element model and wind tunnel test , 2022, Mechanism and Machine Theory.
[34] Zhigang Liu,et al. Assessment of Dynamic Interaction Performance of High-Speed Pantograph and Overhead Conductor Rail System , 2022, IEEE Transactions on Instrumentation and Measurement.