Fuzzy job shop scheduling problem with availability constraints

This paper presents the fuzzy job shop scheduling problem with availability constraints. The objective is to find a schedule that maximizes the minimum agreement index subject to periodic maintenance, non-resumable jobs and fuzzy due-date. A random key genetic algorithm (RKGA) is proposed for the problem, in which a novel random key representation, a new decoding strategy incorporating maintenance operation and discrete crossover (DX) are used. RKGA is applied to some fuzzy scheduling problem with availability constraints and compared with other algorithms. Computational results show that RKGA performs better than other algorithms.

[1]  James C. Bean,et al.  Genetic Algorithms and Random Keys for Sequencing and Optimization , 1994, INFORMS J. Comput..

[2]  G. Thompson,et al.  Algorithms for Solving Production-Scheduling Problems , 1960 .

[3]  Deming Lei Pareto archive particle swarm optimization for multi-objective fuzzy job shop scheduling problems , 2008 .

[4]  Wen-Jinn Chen,et al.  Minimizing number of tardy jobs on a single machine subject to periodic maintenance , 2009 .

[5]  Jean-Charles Billaut,et al.  New Single Machine and Job-Shop Scheduling Problems with Availability Constraints , 2005, J. Sched..

[6]  Mitsuo Gen,et al.  Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm , 2006, J. Intell. Manuf..

[7]  Kalyanmoy Deb,et al.  A Comparative Analysis of Selection Schemes Used in Genetic Algorithms , 1990, FOGA.

[8]  Masatoshi Sakawa,et al.  Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms , 2000, Eur. J. Oper. Res..

[9]  M. Kuroda,et al.  Fuzzy Job Shop Scheduling , 1996 .

[10]  Chung Yee Lee,et al.  Scheduling maintenance and semiresumable jobs on a single machine , 1999 .

[11]  Abdelhakim Artiba,et al.  Scheduling two-stage hybrid flow shop with availability constraints , 2006, Comput. Oper. Res..

[12]  Xiaoyu Song,et al.  Study on the combination of genetic algorithms and ant Colony algorithms for solving fuzzy job shop scheduling problems , 2006, The Proceedings of the Multiconference on "Computational Engineering in Systems Applications".

[13]  Yunlong Zhu,et al.  Fuzzy Programming for Multiobjective Fuzzy Job Shop Scheduling with Alternative Machines Through Genetic Algorithms , 2005, ICNC.

[14]  Deming Lei,et al.  A genetic algorithm for flexible job shop scheduling with fuzzy processing time , 2010 .

[15]  Samir Lamouri,et al.  Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan , 2008 .

[16]  Zeng Jian-chao Solving flexible job shop scheduling problem using genetic (algorithm) , 2004 .

[17]  Qun Niu,et al.  Particle swarm optimization combined with genetic operators for job shop scheduling problem with fuzzy processing time , 2008, Appl. Math. Comput..

[18]  M. Sakawa,et al.  An efficient genetic algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy duedate , 1999 .

[19]  Chien-Hung Lin,et al.  Makespan minimization for two parallel machines with an availability constraint , 2005, Eur. J. Oper. Res..