Fuzzy job shop scheduling problem with availability constraints
暂无分享,去创建一个
[1] James C. Bean,et al. Genetic Algorithms and Random Keys for Sequencing and Optimization , 1994, INFORMS J. Comput..
[2] G. Thompson,et al. Algorithms for Solving Production-Scheduling Problems , 1960 .
[3] Deming Lei. Pareto archive particle swarm optimization for multi-objective fuzzy job shop scheduling problems , 2008 .
[4] Wen-Jinn Chen,et al. Minimizing number of tardy jobs on a single machine subject to periodic maintenance , 2009 .
[5] Jean-Charles Billaut,et al. New Single Machine and Job-Shop Scheduling Problems with Availability Constraints , 2005, J. Sched..
[6] Mitsuo Gen,et al. Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm , 2006, J. Intell. Manuf..
[7] Kalyanmoy Deb,et al. A Comparative Analysis of Selection Schemes Used in Genetic Algorithms , 1990, FOGA.
[8] Masatoshi Sakawa,et al. Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms , 2000, Eur. J. Oper. Res..
[9] M. Kuroda,et al. Fuzzy Job Shop Scheduling , 1996 .
[10] Chung Yee Lee,et al. Scheduling maintenance and semiresumable jobs on a single machine , 1999 .
[11] Abdelhakim Artiba,et al. Scheduling two-stage hybrid flow shop with availability constraints , 2006, Comput. Oper. Res..
[12] Xiaoyu Song,et al. Study on the combination of genetic algorithms and ant Colony algorithms for solving fuzzy job shop scheduling problems , 2006, The Proceedings of the Multiconference on "Computational Engineering in Systems Applications".
[13] Yunlong Zhu,et al. Fuzzy Programming for Multiobjective Fuzzy Job Shop Scheduling with Alternative Machines Through Genetic Algorithms , 2005, ICNC.
[14] Deming Lei,et al. A genetic algorithm for flexible job shop scheduling with fuzzy processing time , 2010 .
[15] Samir Lamouri,et al. Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan , 2008 .
[16] Zeng Jian-chao. Solving flexible job shop scheduling problem using genetic (algorithm) , 2004 .
[17] Qun Niu,et al. Particle swarm optimization combined with genetic operators for job shop scheduling problem with fuzzy processing time , 2008, Appl. Math. Comput..
[18] M. Sakawa,et al. An efficient genetic algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy duedate , 1999 .
[19] Chien-Hung Lin,et al. Makespan minimization for two parallel machines with an availability constraint , 2005, Eur. J. Oper. Res..