Toward Pull Remanufacturing: A Case Study on Material and Information Flow Uncertainties at a German Engine Remanufacturer

Abstract Together with reuse and material recycling, remanufacturing has emerged as a sustainable approach for used products. Remanufacturing is more complex than manufacturing, due to the uncertainties in material and information flows inside the remanufacturing facility and along the product life-cycle. Therefore, some remanufacturers intend to use lean production principles and philosophies to deal with this complexity and to improve their operations. The aim of this paper is to identify reasons for possible material and information flow uncertainties and develop lean-inspired solution at a German engine remanufacturer. The empirical data were collected via a Material and Information Flow Analysis workshop. The reasons for missing, late, defective and non-available spare parts as well as disrupted, uneven, chaotic and inaccessible information flows are identified. Finally, a lean pull Kanban reordering system is suggested and recognized to be a proper solution to remanufacturing complexity.

[1]  V. Guide Production planning and control for remanufacturing: industry practice and research needs , 2000 .

[2]  F. Robert Jacobs,et al.  Operations and supply management : the core , 2008 .

[3]  Erik Sundin,et al.  Exploring inter-organizational relationships in automotive component remanufacturing , 2014 .

[4]  Erik Sundin,et al.  How Can Remanufacturing Processes Become Leaner , 2006 .

[5]  Jose M. Framinan,et al.  A methodology for the design and operation of pull‐based supply chains , 2013 .

[6]  Erik Sundin,et al.  Reverse logistics challenges in remanufacturing of automotive mechatronic devices , 2013 .

[7]  Daniel T. Jones,et al.  Seeing the Whole Mapping the Extended Value Stream , 2002 .

[8]  Surendra M. Gupta,et al.  Coping with disassembly yield uncertainty in remanufacturing using sensor embedded products , 2011 .

[9]  J. Ostlin,et al.  Lean Production Principles in Remanufacturing A Case Study at a Toner Cartridge Remanufacturer , 2007, Proceedings of the 2007 IEEE International Symposium on Electronics and the Environment.

[10]  Erik Sundin,et al.  Minimum Time for Material and Information Flows Analysis at a Forklift Truck Remanufacturer , 2014 .

[11]  Erik Sundin,et al.  Remanufacturing: Challenges and Opportunities to be Lean , 2013 .

[12]  Jose M. Framiñan,et al.  Token-based pull production control systems: an introductory overview , 2012, J. Intell. Manuf..

[13]  Tomasz Koch,et al.  Methodology of Designing Disassembly and Reassembly Processes Using Lean Thinking Approach , 2009, APMS.

[14]  Robert James Kucner,et al.  A socio-technical study of lean manufacturing deployment in the remanufacturing context , 2008 .

[15]  J. Cutcher-Gershenfeld,et al.  Lean Thinking , 2019, Encyclopedia of Sustainable Management.

[16]  Wallace J. Hopp,et al.  To Pull or Not to Pull: What Is the Question? , 2004, Manuf. Serv. Oper. Manag..

[17]  Daniel T. Jones,et al.  Lean Solutions: How Companies and Customers Can Create Value and Wealth Together , 2005 .

[18]  Louise Lindkvist,et al.  The Use of Product Life-Cycle Information in a Value Chain Including Remanufacturing , 2013 .

[19]  Steve L. Hunter,et al.  LEAN REMANUFACTURING: A CELLULAR CASE STUDY , 2007 .