Selecting of the Most Adaptable Work Equipment
暂无分享,去创建一个
[1] Walter J. Michalski. Six Sigma Tool Navigator: The Master Guide for Teams , 2003 .
[2] Gunther Reinhart,et al. Wandlungsfähige Fabrikgestaltung , 2002 .
[3] Eckart Zitzler,et al. Evolutionary algorithms for multiobjective optimization: methods and applications , 1999 .
[4] Marko Starbek,et al. Reduction of Machine Setup Time , 2010 .
[5] John Stufken,et al. Optimal Paired Comparison Designs for Factorial Experiments. , 1988 .
[6] Joze Duhovnik,et al. Teamwork as a Precondition for Simultaneous Product Realization , 2010, Concurr. Eng. Res. Appl..
[7] Hans-Peter Wiendahl,et al. Handbuch Fabrikplanung: Konzept, Gestaltung und Umsetzung wandlungsfähiger Produktionsstätten , 2009 .
[8] Zoran Anišić,et al. Assembly Initiated Production as a Prerequisite for Mass Customization and Effective Manufacturing , 2008 .
[9] I. Palčič,et al. Analysis of Innovation Concepts in Slovenian Manufacturing Companies , 2010 .
[10] C. S. P Rao,et al. FLEXIBLE MANUFACTURING SYSTEMS MODELLING AND PERFORMANCE EVALUATION USING AUTOMOD , 2011 .
[11] Marko Starbek,et al. Teamwork in the Simultaneous Product Realisation , 2012 .
[12] Nils Müller,et al. Methodik zur Erhöhung der Wandlungsfähigkeit von Produktionssystemen , 2004 .
[13] Mirko Soković,et al. Integration of Simulation and Lean Tools in Effective Production Systems – Case Study , 2012 .