Dynamic planning and control methodology for strategic and operational construction project management
暂无分享,去创建一个
[1] Moonseo Park. Dynamic planning and control methodology for large-scale concurrent construction projects , 2001 .
[2] John Bowers,et al. System dynamics in project management: a comparative analysis with traditional methods , 1996 .
[3] Sang Hyun Lee. Dynamic quality and change management for large scale concurrent design and construction projects , 2003 .
[4] Steven E. Phelan,et al. What Is Complexity Science, Really? , 2001 .
[5] E. Sarah Slaughter,et al. Models of Construction Innovation , 1998 .
[6] Ian Flood,et al. Barriers to the Development, Adoption, and Implementation of Information Technologies: Case Studies from Construction , 2003 .
[7] John D. Sterman,et al. System Dynamics: Systems Thinking and Modeling for a Complex World , 2002 .
[8] Simaan M. AbouRizk,et al. Combined discrete-event/continuous simulation for project planning , 1997 .
[9] Kendall Scott,et al. UML distilled - a brief guide to the Standard Object Modeling Language (2. ed.) , 2000, notThenot Addison-Wesley object technology series.
[10] James M. Lyneis,et al. Strategic management of complex projects: a case study using system dynamics , 2001 .
[11] Feniosky Peña-Mora,et al. Quality and Change Management Framework for Concurrent Design and Construction , 2003 .
[12] Quentin W. Fleming,et al. Earned Value Project Management , 1996 .
[13] Gregory A. Howell,et al. Competing Construction Management Paradigms , 2003, Lean Construction Journal.
[14] Feniosky Peña-Mora,et al. Dynamic change management for construction: introducing the change cycle into model‐based project management , 2003 .
[15] John D. Sterman,et al. System Dynamics Modeling for Project Management , 1992 .
[16] Tarek Hegazy,et al. Optimization of Resource Allocation and Leveling Using Genetic Algorithms , 1999 .
[17] Hans Jochen Scholl,et al. Agent-based and system dynamics modeling: a call for cross study and joint research , 2001, Proceedings of the 34th Annual Hawaii International Conference on System Sciences.
[18] Feniosky Peña-Mora,et al. Reliability and Stability Buffering Approach in Concurrent Design and Construction Projects , 2003 .
[19] Feniosky Peña-Mora,et al. MULTIPLE DEVICE COLLABORATIVE AND REAL TIME ANALYSIS SYSTEM FOR PROJECT MANAGEMENT IN CIVIL ENGINEERING , 2002 .
[20] George P. Richardson. Introduction to the system dynamics review , 1985 .