Effects of Breakdown, Backlog and Rework on Replenishment Lot Size

This study studies the effects of machine breakdown, backlog and rework on the replenishment lot size. In real-life manufacturing systems, random defective rate and breakdown of equipment are inevitable. When backlogging is permitted during a production run, a random machine failure may take place either in backlog filling stage or in inventory piling time; this study focuses on the former situation and considers all defective items produced are repairable through a rework process. The objective of this study is to determine the optimal run time that minimizes the long-run average production-inventory costs. The result can be directly applied to the practical production planning and control field to assist practitioner in production management cost reduction.

[1]  Yuan-Shyi Peter Chiu,et al.  Remarks on the optimization process of a manufacturing system with stochastic breakdown and rework , 2010, Appl. Math. Lett..

[2]  A. Seidmann,et al.  Production lot sizing with machine breakdowns , 1992 .

[3]  David F. Pyke,et al.  Inventory management and production planning and scheduling , 1998 .

[4]  Viliam Makis,et al.  An EMQ model with inspections and random machine failures , 1998, J. Oper. Res. Soc..

[5]  Yuan-Shyi Peter Chiu,et al.  Mathematical modelling for determining economic batch size and optimal number of deliveries for EPQ model with quality assurance , 2010 .

[6]  Helmut Schneider The service level in inventory control systems , 1979 .

[7]  Yuan-Shyi Peter Chiu,et al.  Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown , 2010, Comput. Math. Appl..

[8]  Heinrich Kuhn,et al.  A dynamic lot sizing model with exponential machine breakdowns , 1997, Eur. J. Oper. Res..

[9]  Bong Jin Yum,et al.  Optimal inspection policies in a serial production system including scrap rework and repair: an MILP approach , 1987 .

[10]  Chung-Ho Chen,et al.  Optimum profit model based on order quantity, product price, and process quality level , 2011, Expert Syst. Appl..

[11]  Panganamala Ramana Kumar,et al.  Optimality of Zero-Inventory Policies for Unreliable Manufacturing Systems , 1988, Oper. Res..

[12]  Ruud H. Teunter,et al.  Lot-sizing for a single-stage single-product production system with rework of perishable production defectives , 2003, OR Spectr..

[13]  T.C.E. Cheng,et al.  An Economic Order Quantity Model with Demand-Dependent Unit Production Cost and Imperfect Production Processes , 1991 .

[14]  Victor B. Kreng,et al.  Optimal replenishment decision in an EPQ model with defective items under supply chain trade credit policy , 2011, Expert Syst. Appl..

[15]  Ashish Sharma,et al.  Optimal procurement and pricing policies for inventory models with price and time dependent seasonal demand , 2010, Math. Comput. Model..

[16]  R. Faure,et al.  Introduction to operations research , 1968 .

[17]  Yuan-Shyi Peter Chiu,et al.  Solving an economic production lot size problem with multi-delivery policy and quality assurance using an algebraic approach , 2010 .

[18]  Victor B. Kreng,et al.  The optimal replenishment decisions under two levels of trade credit policy depending on the order quantity , 2010, Expert Syst. Appl..

[19]  Tadashi Dohi,et al.  Exact formulation of stochastic EMQ model for an unreliable production system , 2004, J. Oper. Res. Soc..

[20]  Jui-Tsung Wong The distribution processing and replenishment policy of the supply chain under asymmetric information and deterioration: Insight into the information value , 2010, Expert Syst. Appl..

[21]  Tonya Boone,et al.  The Impact of Imperfect Processes on Production Run Times , 2000, Decis. Sci..

[22]  Ping Yang,et al.  Determining a threshold control policy for an imperfect production system with rework jobs , 1999 .

[23]  Chin-Tai Chen Dynamic preventive maintenance strategy for an aging and deteriorating production system , 2011, Expert Syst. Appl..

[24]  Singa Wang Chiu,et al.  Mathematical modeling for production system with backlogging and failure in repair , 2006 .

[25]  Liang-Yuh Ouyang,et al.  Optimal lot size for an item with partial backlogging rate when demand is stimulated by inventory above a certain stock level , 2010, Math. Comput. Model..

[26]  Meir J. Rosenblatt,et al.  Simultaneous determination of production cycle and inspection schedules in a production system , 1987 .

[27]  Mohamad Y. Jaber,et al.  A production/remanufacturing inventory model with price and quality dependant return rate , 2010, Comput. Ind. Eng..

[28]  Nidhal Rezg,et al.  Analysis of a production/inventory system with randomly failing production unit subjected to a minimum required availability level , 2006 .

[29]  Hong-Dar Lin,et al.  Mathematical modeling for solving manufacturing run time problem with defective rate and random machine breakdown , 2011, Comput. Ind. Eng..

[30]  Y. Chiu Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging , 2003 .

[31]  Singa Wang Chiu,et al.  Optimal replenishment policy for manufacturing systems with failure in rework, backlogging and random breakdown , 2009 .

[32]  Yuan-Shyi Peter Chiu,et al.  Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments , 2011, Math. Comput. Model..

[33]  Singa Wang Chiu,et al.  Robust planning in optimization for production system subject to random machine breakdown and failure in rework , 2010, Comput. Oper. Res..