A note on the upper bound and an algorithm for the optimal repair cost under minimal repair
暂无分享,去创建一个
[1] R. I. Phelps. Replacement Policies under Minimal Repair , 1981 .
[2] Toshio Nakagawa,et al. The Optimum Repair Limit Replacement Policies , 1974 .
[3] P. K. Kapur,et al. Some replacement policies with minimal repairs and repair cost limit , 1989 .
[4] R. I. Phelps. Optimal Batch Sizes for a Two-Stage Production System , 1981 .
[5] N. L. Butani. Replacement policies based on minimal repair and cost limit criterion , 1991 .
[6] Kyung Soo Park. Cost limit replacement policy under minimal repair , 1983 .
[7] Kyung S. Park. Pseudodynamic cost limit replacement model under minimal repair , 1985 .
[8] R. Barlow,et al. Optimum Preventive Maintenance Policies , 1960 .
[9] Kyung Soo Park,et al. Optimal number of minor failures before replacement , 1987 .
[10] D. S. Bai,et al. An Age Replacement Policy with Minimal Repair Cost Limit , 1986, IEEE Transactions on Reliability.
[11] E. Muth. An Optimal Decision Rule for Repair vs Replacement , 1977, IEEE Transactions on Reliability.
[12] Kyung S. Park. Optimal Number of Minimal Repairs before Replacement , 1979, IEEE Transactions on Reliability.
[13] D. N. P. Murthy,et al. A Note on the Repair Limit Replacement Policy , 1980 .
[14] Kyung Soo Park. Human reliability with probabilistic learning in discrete and continuous tasks: Conceptualization and modeling , 1985 .
[15] G. Thomas. Calculus and Analytic Geometry , 1953 .