A methodology for developing congestion management–related projects for the Indiana state highway network is described. The methodology is based on a sketch planning analysis technique that can be used with limited input data. The software package provides estimates of costs and other effects of potential congestion mitigation projects to undertake in a given year, which can be used by planners and programmers in long-range planning. Project types include road widening, high-occupancy-vehicle facilities, ramp metering, incident management, and arterial traffic signal coordination. The impact is assessed in travel time savings, vehicle operating cost savings, crash cost savings, and emission reductions. An example application of the methodology is given for the 7.81-mi segment of I-65 between Interchanges 116 and 123 in the Indianapolis area.
[1]
Kumares C. Sinha,et al.
THE DEVELOPMENT OF A PROTOTYPE CONGESTION MANAGEMENT SYSTEM FOR THE STATE OF INDIANA: PHASE I. FINAL REPORT
,
1994
.
[2]
R K Whitford,et al.
CONGESTION ESTIMATES FOR INDIANA STATE HIGHWAY SYSTEM
,
1997
.
[3]
J D Fricker,et al.
Accident Reduction Factors for Indiana
,
1991
.
[4]
Robert K. Whitford,et al.
Development of a Congestion Management System for Indiana
,
1997
.
[5]
Andrew P Tarko,et al.
Model of Free-Flow Speed for Indiana Arterial Roads
,
2001
.
[6]
Kumares C. Sinha,et al.
Optimal design of freeway incident response systems
,
1999
.