Simulation-assisted run-to-run control for battery manufacturing in a cloud environment
暂无分享,去创建一个
Alexander Verl | Oliver Riedel | Michael Oberle | Karl Kubler | M. Oberle | A. Verl | O. Riedel | Karl Kübler
[1] John Musacchio,et al. On the utility of run to run control in semiconductor manufacturing , 1997, 1997 IEEE International Symposium on Semiconductor Manufacturing Conference Proceedings (Cat. No.97CH36023).
[2] Thomas F. Edgar,et al. A comparison of run-to-run control algorithms , 2002, Proceedings of the 2002 American Control Conference (IEEE Cat. No.CH37301).
[3] Günter Pritschow,et al. “Hardware in the Loop” Simulation of Machine Tools , 2004 .
[4] Giovanni Cutuli,et al. Performance evaluation of OPC UA , 2010, 2010 IEEE 15th Conference on Emerging Technologies & Factory Automation (ETFA 2010).
[5] Hyoungjoo Lee,et al. Virtual metrology for run-to-run control in semiconductor manufacturing , 2011, Expert Syst. Appl..
[6] Ralph J. Brodd,et al. Cost comparison of producing high-performance Li-ion batteries in the U.S. and in China , 2013 .
[7] Birgit Vogel-Heuser,et al. Global Information Architecture for Industrial Automation , 2013 .
[8] Karl-Heinz Pettinger,et al. Fertigungsprozesse von Lithium-Ionen-Zellen , 2013 .
[9] Christian Sesterheim,et al. Fertigungsverfahren von Lithium-Ionen-Zellen und -Batterien , 2013 .
[10] Stephan Biller,et al. A Quality Flow Model in Battery Manufacturing Systems for Electric Vehicles , 2014, IEEE Transactions on Automation Science and Engineering.
[11] Stephan Biller,et al. Market Demand Oriented Data-Driven Modeling for Dynamic Manufacturing System Control , 2015, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[12] Y. J. Reddy,et al. Industrial process automation systems , 2015 .
[13] Ralf Stetter,et al. A fault-tolerant approach to the control of a battery assembly system , 2016 .
[14] Stephan Biller,et al. IMPROVING BATTERY MANUFACTURING THROUGH QUALITY AND PRODUCTIVITY BOTTLENECK INDICATORS , 2016 .
[15] Jingshan Li,et al. Transient Analysis of Serial Production Lines With Perishable Products: Bernoulli Reliability Model , 2017, IEEE Transactions on Automatic Control.
[16] Shiyu Zhou,et al. FEDERAL AND STATE INCENTIVES HEIGHTEN CONSUMER INTEREST IN ELECTRIC VEHICLES , 2017 .