Client values within post-disaster reconstruction contracting services

Purpose The purpose of this paper is to explore and prioritize the key client values within contracting services for reconstructing the built environment in post-disaster situations. Design/methodology/approach A literature review, semi-structured interviews and questionnaire survey were included in this study. A comparative analysis was used to obtain different perspectives between public and private sectors. Findings A total of 39 client values were identified in this study. Clients for disaster reconstruction services put more emphasis on values such as timeliness, availability of resources, competency, building a trust-based relationship, financial stability, and communication techniques than contract price. Public and private clients have a different perspective regarding the importance of the identified values, while these are not statistically significant for the most important values. Research limitations/implications The construction literature is focussed on business-as-usual rather than post-disaster reconstruction. To ensure that reconstruction programmes after a disaster are successfully implemented, it is necessary to identify and prioritize the client values within contracting services. Focussing the attention of the service providers on these values is believed to have the greatest impact on the programmes’ success. Practical implications Understanding the client values identified by this study can aid contractors to better prepare for reconstruction programmes and provide improved services to clients. Originality/value A number of important client values within contracting services that appear to have a bearing on the success of disaster reconstruction programmes were identified in this study.

[1]  Suzanne Wilkinson,et al.  Build Back Better principles for post‐disaster structural improvements , 2013 .

[2]  Edward J. Jaselskis,et al.  Optimal Allocation of Project Management Resources for Achieving Success , 1991 .

[3]  Plato Jack Powell Post-disaster reconstruction: A current analysis of Gujarat's response after the 2001 earthquake , 2011 .

[4]  Mohan M. Kumaraswamy,et al.  An evaluation of construction time performance in the building industry , 1996 .

[5]  Sung Ho Park,et al.  Whole life performance assessment: critical success factors , 2009 .

[6]  Jyh-Bin Yang,et al.  Development of a customer satisfaction evaluation model for construction project management , 2008 .

[7]  Suzanne Wilkinson,et al.  Improving construction sector resilience , 2016 .

[8]  Iftekhar Ahmed,et al.  An overview of post‐disaster permanent housing reconstruction in developing countries , 2011 .

[9]  Emlyn Witt,et al.  An analysis of issues for the management of post-disaster housing reconstruction , 2016 .

[10]  Suzanne Wilkinson,et al.  Resource challenges for housing reconstruction , 2013 .

[11]  John A. Gambatese,et al.  Qualitative Research: Application of the Delphi Method to CEM Research , 2010 .

[12]  Cassidy Johnson,et al.  Truths and myths about community participation in post-disaster housing projects , 2007 .

[13]  Suzanne Wilkinson,et al.  Development of a conceptual team integration performance index for alliance projects , 2013 .

[14]  Jiuping Xu,et al.  Estimation of Time for Wenchuan Earthquake Reconstruction in China , 2011 .

[15]  Suzanne Wilkinson,et al.  Changes in resource need for post-disaster reconstruction: a longitudinal study in China , 2012 .

[16]  U. Flick An Introduction to Qualitative Research , 1998 .

[17]  Michael Coyle,et al.  Critical Success Factors for Construction Projects , 1992 .

[18]  Suzanne D. Pawlowski,et al.  The Delphi method as a research tool: an example, design considerations and applications , 2004, Inf. Manag..

[19]  J. Masterman An Introduction to Building Procurement Systems , 1990 .

[20]  Bambang Trigunarsyah,et al.  Rebuilding housing after a disaster : factors for failure , 2012 .

[21]  Mohan M. Kumaraswamy,et al.  Linking procurement systems to project priorities , 1998 .

[22]  Honglei Yi,et al.  Research trends of post disaster reconstruction: The past and the future , 2014 .

[23]  Mark Bassett,et al.  Legislation for building back better of horizontal infrastructure , 2017 .

[24]  D. Hinkle,et al.  Applied statistics for the behavioral sciences , 1979 .

[25]  E. Seville,et al.  Donor-driven resource procurement for post-disaster reconstruction: Constraints and actions , 2011 .

[26]  Craig Langston,et al.  Participatory project management for improved disaster resilience , 2013 .

[27]  James A. Holstein,et al.  Handbook of Interview Research: Context and Method , 2001 .

[28]  M. Lam,et al.  Screening and assessing ideas and delusions of reference using a semi-structured interview scale: A validation study of the Ideas of Reference Interview Scale (IRIS) in early psychosis patients , 2012, Schizophrenia Research.

[29]  Edwin H.W. Chan,et al.  Factors Influencing Building Contractors’ Pricing for Time-Related Risks in Tenders , 2009 .

[30]  Randy Rapp,et al.  Disaster Recovery Project Management: Bringing Order from Chaos , 2011 .

[31]  Dilanthi Amaratunga,et al.  An integrative review of the built environment discipline's role in the development of society's resilience to disasters , 2010 .

[32]  Qiping Shen,et al.  An Investigation of Critical Success Factors in Construction Project Briefing by Way of Content Analysis , 2008 .

[33]  Mohan M. Kumaraswamy,et al.  Relational Contracting and Teambuilding: Assessing Potential Contractual and Noncontractual Incentives , 2008 .

[34]  John R. Labadie,et al.  Auditing of post‐disaster recovery and reconstruction activities , 2008 .

[35]  Walid Belassi,et al.  A new framework for determining critical success/failure factors in projects , 1996 .

[36]  Dilanthi Amaratunga,et al.  Critical success factors for community‐based post‐disaster housing reconstruction projects in the pre‐construction stage in Indonesia , 2013 .

[37]  Bernard Kofi Baiden,et al.  Key Performance Indicators for Project Success in Ghanaian Contractors , 2016 .

[38]  Suzanne Wilkinson,et al.  Re-conceptualising “Building Back Better” to improve post-disaster recovery , 2014 .

[39]  Y. C. Kog,et al.  Critical Success Factors for Different Project Objectives , 1999 .

[40]  Carolyn Hayles,et al.  An examination of decision making in post disaster housing reconstruction , 2010 .

[41]  M. Patton Qualitative Research & Evaluation Methods: Integrating Theory and Practice , 2014 .

[42]  Suzanne Wilkinson,et al.  Exploring construction client values and qualities: Are these two distinct concepts in construction studies? , 2017 .