Investigation of the early-onset breakdown phenomenon at urban expressway bottlenecks in Shanghai

Based on the analyses of recurring bottlenecks in Shanghai's expressways using spatial–temporal diagrams, the method of transformed cumulative curves was used to investigate the traffic flow characteristics revealed by loop detector data at two typical isolated bottlenecks (a lane-drop and an on-ramp). The pre-queue flow (PQF) and queue discharge flow (QDF) of the two bottlenecks were analysed. The QDFs were an average of 18% and 27% higher than the PQF in the lane-drop and on-ramp bottlenecks, respectively. These findings differ from the results of bottlenecks in other countries (e.g. the M4 motorway near London, UK; I-494 in Minneapolis, MN, USA; the Queen Elizabeth Way (QEW) and the Gardiner Expressway in metropolitan Toronto, Canada) and indicate that lane-drop and on-ramp bottlenecks in Shanghai experience early onsets of traffic breakdown. The potential causes of the early onset of breakdown were discussed from the perspectives of driving behaviour, the temporal features of the flow rate and the features of merging.

[1]  Michael J. Cassidy,et al.  METHODOLOGY FOR ASSESSING DYNAMICS OF FREEWAY TRAFFIC FLOW , 1995 .

[2]  Carlos F. Daganzo,et al.  Fundamentals of Transportation and Traffic Operations , 1997 .

[3]  Sam Yagar,et al.  Exploration of the Breakdown Phenomenon in Freeway Traffic , 1998 .

[4]  Robert L. Bertini,et al.  OBSERVATIONS AT A FREEWAY BOTTLENECK , 1999 .

[5]  M. Cassidy,et al.  Some traffic features at freeway bottlenecks , 1999 .

[6]  Carlos F. Daganzo,et al.  A BEHAVIORAL THEORY OF MULTI-LANE TRAFFIC FLOW. PART II, MERGES AND THE ONSET OF CONGESTION , 1999 .

[7]  Boris S. Kerner,et al.  Theory of Breakdown Phenomenon at Highway Bottlenecks , 2000 .

[8]  Sam Yagar,et al.  Breakdown-Related Capacity for Freeway with Ramp Metering , 2001 .

[9]  Lily Elefteriadou,et al.  Defining Freeway Capacity as Function of Breakdown Probability , 2001 .

[10]  Robert L. Bertini,et al.  Some observed queue discharge features at a freeway bottleneck , 2002 .

[11]  S. Wong,et al.  An analytical shock-fitting algorithm for LWR kinematic wave model embedded with linear speed–density relationship , 2002 .

[12]  D. Levinson,et al.  Some Properties of Flows at Freeway Bottlenecks , 2004 .

[13]  David M Levinson,et al.  A Queuing and Statistical Analysis of Freeway Bottleneck Formation , 2004 .

[14]  Hubert Rehborn,et al.  Recognition and tracking of spatial–temporal congested traffic patterns on freeways , 2004 .

[15]  Michael J. Cassidy,et al.  Increasing Capacity of an Isolated Merge by Metering its On-Ramp , 2004 .

[16]  D. Helbing,et al.  The German Autobahn: an ITS test bed for examining dynamic traffic flow phenomena , 2005, Proceedings. 2005 IEEE Intelligent Transportation Systems, 2005..

[17]  R. Bertini,et al.  Empirical Study of Traffic Features at a Freeway Lane Drop , 2005 .

[18]  James H Banks Relationship Between Mean Flow Rate and Probability of Breakdown at Freeway Bottlenecks , 2006 .

[19]  James H Banks Flow Breakdown at Freeway Bottlenecks , 2009 .

[20]  Hani S. Mahmassani,et al.  Predicting Flow Breakdown Probability and Duration in Stochastic Network Models: Impact on Travel Time Reliability , 2011 .

[21]  Jian Sun,et al.  Online evaluation of an integrated control strategy at on-ramp bottleneck for urban expressways in Shanghai , 2014 .