A systematic review of application of multi-criteria decision analysis for aging-dam management
暂无分享,去创建一个
José María Moreno-Jiménez | Víctor Yepes | Iván Zamarrón-Mieza | J. Moreno‐Jiménez | V. Yepes | Iván Zamarrón-Mieza
[1] G Feng,et al. A comprehensive evaluation model for rockburst risk prediction based on analytic hierarchy process and probabilistic optimization , 2011 .
[2] Bojan Srdjevic,et al. An Objective Multi-Criteria Evaluation of Water Management Scenarios , 2004 .
[3] Luisa Fernanda Ribeiro Reis,et al. Leak detection by inverse transient analysis in an experimental PVC pipe system , 2011 .
[4] Marnik Vanclooster,et al. Effect of Averaging Operators in Fuzzy Optimization of Reservoir Operation , 2002 .
[5] Ying Jiang,et al. Research on the Grey Assessment Method of Dam Failure Risk , 2011 .
[6] C. Chang,et al. Multi-criteria analysis via the VIKOR method for prioritizing land-use restraint strategies in the Tseng-Wen reservoir watershed. , 2009, Journal of environmental management.
[7] Slobodan P. Simonovic,et al. Fuzzy multiobjective models for optimal operation of a hydropower system , 2013 .
[8] Song Jiang Wang,et al. Risk Analysis of BOT Finance Mode on Hydropower Projects Based on Analytic Hierarchy Process – Case Study of Xi He Hydropower Station in Anhui Province , 2012 .
[9] Wei Jiang,et al. Application study of ANP in risk evaluation for water resources and hydropower project , 2010, The 2nd International Conference on Information Science and Engineering.
[10] Jian Cang Xie,et al. Multi-Objective Decision Model of Reservoir Flood Control Operation , 2012 .
[11] Gu Chong-shi. Mechanism of dam behavior assessment with fuzzy extension theory , 2006 .
[12] Qing Wang,et al. Susceptibility analysis of large-scale debris flows based on combination weighting and extension methods , 2013, Natural Hazards.
[13] Qiuwen Zhang,et al. Design and Implementation of Dam Failure Risk Assessment System Based on Fuzzy Mathematics , 2008, 2008 IEEE International Symposium on Knowledge Acquisition and Modeling Workshop.
[14] S. Ng,et al. A fuzzy analytic hierarchy process (FAHP) approach to eco-environmental vulnerability assessment for the Danjiangkou reservoir area, China. , 2009 .
[15] Hui Peng,et al. Study on the Comprehensive Safety Assessment of Earth Fill Dam Based on AHP Methods , 2009 .
[16] Han Liang,et al. Study on Stability of Rock at Reservoir Banks Slop Based on AHP , 2012 .
[17] Song Jiang Wang,et al. Case Study on the OOPP Theory Using AHP Method-Application in Improvement of Long Feng Hydropower , 2013 .
[18] Gang Li,et al. Multiple criteria data envelopment analysis for full ranking units associated to environment impact assessment , 2006 .
[19] Qi Changqing. Research on Priority Decision-Making Method of Dam Removal , 2010, 2010 3rd International Conference on Information Management, Innovation Management and Industrial Engineering.
[20] S. Opricovic,et al. Dynamic compromise programming with application to water reservoir management , 1993 .
[21] Reza Kerachian,et al. Ranking solutions of multi-objective reservoir operation optimization models using multi-criteria decision analysis , 2011, Expert Syst. Appl..
[22] Lin Gang Tian,et al. Research on Risk Assessment of Reservoir by AHP-Fuzzy Comprehensive Analysis Method , 2012 .
[23] José María Moreno-Jiménez,et al. A new e-learning tool for cognitive democracies in the Knowledge Society , 2014, Comput. Hum. Behav..
[24] Cristina Torres-Machi,et al. Current Models and Practices of Economic and Environmental Evaluation for Sustainable Network-Level Pavement Management , 2014 .
[25] Xiaoling Wang,et al. Fuzzy Hierarchy Comprehensive Evaluation on Dam-Break Risk Analysis , 2011 .
[26] Hao Fanghua,et al. A Fuzzy Multi-Criteria Group Decision-Making Model Based on Weighted Borda Scoring Method for Watershed Ecological Risk Management: a Case Study of Three Gorges Reservoir Area of China , 2010 .
[27] Harris Cooper,et al. Integrating Research: A Guide for Literature Reviews , 1989 .
[28] Maryam Kordi,et al. Effects of increasing fuzziness on analytic hierarchy process for spatial multicriteria decision analysis , 2012, Comput. Environ. Urban Syst..
[29] Z. Chen. Study on multi-attribute group decision-making model of construction diversion risk , 2013 .
[30] Jozi Seyed Ali,et al. Environmental Risk Assessment of Dams by Using Multi-Criteria Decision-Making Methods: A Case Study of the Polrood Dam, Guilan Province, Iran , 2014 .
[31] Yan Bin,et al. A Combination Forecasting Model Based on IOWA Operator for Dam Safety Monitoring , 2013, 2013 Fifth International Conference on Measuring Technology and Mechatronics Automation.
[32] Chen Guoxing. Fuzzy comprehensive evaluation on aseismic behavior of reservoir dams , 2013 .
[33] Guohe Huang,et al. Managing water resources system in a mixed inexact environment using superiority and inferiority measures , 2011, Stochastic Environmental Research and Risk Assessment.
[34] Lisa Scholten,et al. Strategic rehabilitation planning of piped water networks using multi-criteria decision analysis. , 2014, Water research.
[35] Branko Vucijak,et al. Applicability of multicriteria decision aid to sustainable hydropower , 2013 .
[36] R.-S. Lu,et al. Analysis of reservoir water quality using fuzzy synthetic evaluation , 1999 .
[37] S. Díaz-Maldonado,et al. Conciliating conflicting objectives using fuzzy sets in the Yaqui River hydro system, Sonora, Mexico. , 2009 .
[38] Patrizia Lombardi,et al. New spatial decision support systems for sustainable urban and regional development , 2015 .
[39] Hong Sheng Song,et al. Research of Compensating Weights of Cascade Hydropower Stations , 2012 .
[40] Shiliang Su,et al. Integrative fuzzy set pair model for land ecological security assessment: a case study of Xiaolangdi Reservoir Region, China , 2009, 2009 International Conference on Environmental Science and Information Application Technology.
[41] Marc Vuillet,et al. Decision-making method for assessing performance of large levee alignment , 2012, J. Decis. Syst..
[42] Reza Tanha Aminloei,et al. Generation planning in Iranian power plants with fuzzy hierarchical production planning , 2010 .
[43] Thana Boonyasirikul,et al. Hydropower development priority using MCDM method , 2009 .
[44] José María Moreno-Jiménez,et al. A cognitive approach for the multi-objective optimization of RC structural problems , 2015 .
[45] Aregai Tecle,et al. SELECTING A MULTICRITERION DECISION MAKING TECHNIQUE FOR WATERSHED RESOURCES MANAGEMENT , 1992 .
[46] Hong Zhang,et al. Evaluation and Analysis of Water Quality at the Dahuofang Reservoir Based on the Fuzzy Evaluation and Analytical Hierarchy Process , 2013 .
[47] Marshall Flug,et al. Multicriteria decision analysis applied to Glen Canyon Dam , 2000 .
[48] Uwe Ehret,et al. The potential of coordinated reservoir operation for flood mitigation in large basins – A case study on the Bavarian Danube using coupled hydrological–hydrodynamic models , 2014 .
[49] Guohe Huang,et al. A Factorial-based Dynamic Analysis Method for Reservoir Operation Under Fuzzy-stochastic Uncertainties , 2013, Water Resources Management.
[50] Ying Jiang,et al. Research on the Grey Assessment System , 2012, J. Comput..
[51] Sumant A. Choudhari,et al. Multiobjective Multireservoir Operation in Fuzzy Environment , 2010 .
[52] S. Jozi,et al. An integrated Shannon's Entropy–TOPSIS methodology for environmental risk assessment of Helleh protected area in Iran , 2012, Environmental Monitoring and Assessment.
[53] Timothy R. Anderson,et al. Exploring the impact of technology development and adoption for sustainable hydroelectric power and , 2010 .
[54] Mehdi Zare,et al. Active tectonic assessment around Rudbar Lorestan dam site, High Zagros Belt (SW of Iran) , 2011 .
[55] Jian-Lan Zhou,et al. A hybrid approach for safety assessment in high-risk hydropower-construction-project work systems , 2014 .
[56] Ming Zhong,et al. Using Multi-level Fuzzy Comprehensive Evaluation to Assess Reservoir Induced Seismic Risk , 2011, J. Comput..
[57] K P Anagnostopoulos,et al. GIS-based multicriteria municipal solid waste landfill suitability analysis: A review of the methodologies performed and criteria implemented , 2014, Waste management & research : the journal of the International Solid Wastes and Public Cleansing Association, ISWA.
[58] Solomon Tesfamariam,et al. A review of multi-criteria decision-making methods for infrastructure management , 2014 .
[59] Xiaoling Wang,et al. Study of the comprehensive risk analysis of dam-break flooding based on the numerical simulation of flood routing. Part I: model development , 2014, Natural Hazards.
[60] Li Zhongxue. AHP-based mine tailing dam safety assessment , 2011 .
[61] Liu Hong Chang,et al. The Comprehensive Post-Evaluation Based on the Engineering Fuzzy Set Theory of Navigation and Hydropower Junction , 2012 .
[62] Xiao Yi Wang,et al. Comprehensive Evaluation of Implementation Effect on Later-Period Supportive Policy of Reservoir Resettlement Based on ANFIS , 2014 .
[63] Ming Zhong,et al. Using Cloud Model to Improve the Membership Function in Fuzzy Risk Assessment of Reservoir-Induced Seismicity , 2013 .
[64] Huaizhi Su,et al. Macro-comprehensive evaluation method of high rock slope stability in hydropower projects , 2014, Stochastic Environmental Research and Risk Assessment.
[65] Kai Li,et al. Environmental Risk Assessment System for Phosphogypsum Tailing Dams , 2013, TheScientificWorldJournal.
[66] Georgios D. Samaras,et al. Assessing risk in Dam projects using AHP and ELECTRE I , 2014 .
[67] Antonino Cancelliere,et al. Case Study: Multicriteria Assessment of Drought Mitigation Measures , 2005 .
[68] Benjamin F. Hobbs,et al. What Can We Learn from Experiments in Multiobjective Decision Analysis? , 1986, IEEE Transactions on Systems, Man, and Cybernetics.
[69] Jenq-Tzong Shiau,et al. A dual active‐restrictive approach to incorporating environmental flow targets into existing reservoir operation rules , 2010 .
[70] Luis A. García,et al. Comparison of different multicriteria evaluation methods for the Red Bluff diversion dam , 2000, Environ. Model. Softw..
[71] Li Feng,et al. Study on safety evaluation for tailing reservoirs based on the IAHP-fuzzy comprehensive evaluation , 2013, IEEE Conference Anthology.
[72] Marnik Vanclooster,et al. Deriving efficient reservoir operating rules using flexible stochastic dynamic programming , 2001 .
[73] T. E. Thórhallsdóttir,et al. Strategic planning at the national level: Evaluating and ranking energy projects by environmental impact , 2007 .
[74] Jian-Lan Zhou,et al. Safety Assessment of High-Risk Operations in Hydroelectric-Project Based on Accidents Analysis, SEM, and ANP , 2013 .
[75] Bo Sun,et al. Risk identification on hydropower project using the IAHP and extension of TOPSIS methods under interval-valued fuzzy environment , 2012, Natural Hazards.
[76] Jamie Pittock,et al. Taking a second look: climate change, periodic relicensing and improved management of dams , 2011 .
[77] Jiuping Xu,et al. Resource Sharing-Based Multiobjective Multistage Construction Equipment Allocation under Fuzzy Environment , 2013 .
[78] Bojan Srdjevic,et al. Data envelopment analysis of reservoir system performance , 2005, Comput. Oper. Res..
[79] Bing Wang,et al. The ANP Model for Dam Risk Identification of the Hydropower Project , 2010, 2010 Asia-Pacific Power and Energy Engineering Conference.
[80] B. J. C. Perera,et al. Stakeholder preference elicitation and modelling in multi-criteria decision analysis - A case study on urban water supply , 2010, Eur. J. Oper. Res..
[81] Mohammad Karamouz,et al. DEVELOPMENT OF AN ENTROPY- BASED FUZZY EUTROPHICATION INDEX FOR RESERVOIR WATER QUALITY EVALUATION , 2010 .
[82] Wei Wei Sun,et al. Small Hydropower Risk Consequence Evaluation under Drought Conditions , 2012 .
[83] P. P. Mujumdar,et al. Mathematical Tools for Irrigation Water Management , 2002 .
[84] B. Roy. Méthodologie multicritère d'aide à la décision , 1985 .
[85] Yunna Wu,et al. RESEARCH ON THE DRIVERS OF COST CONTROL IN HYDROPOWER CONSTRUCTION PROJECT , 2012 .
[86] Atsushi Tsunekawa,et al. Reservoir sedimentation and its mitigating strategies: a case study of Angereb reservoir (NW Ethiopia) , 2012, Journal of Soils and Sediments.
[87] Bofu Yu,et al. Integrated application of the analytic hierarchy process and the geographic information system for flood risk assessment and flood plain management in Taiwan , 2011 .
[88] M. Nawaz,et al. Consensus Evaluation and Prioritization using GIS and DSS Tools: Case Study of Kalabagh and Bhasha Dam , 2006, 2006 International Conference on Advances in Space Technologies.
[89] Fang Weihua,et al. Safety evaluation model of AHP–SPA for Navigation Hydropower Junction Engineering , 2014 .
[90] Jiaping Wu,et al. Integrative fuzzy set pair model for land ecological security assessment: a case study of Xiaolangdi Reservoir Region, China , 2010 .
[91] Daniel Jato-Espino,et al. A review of application of multi-criteria decision making methods in construction , 2014 .
[92] Serafim Opricovic,et al. Fuzzy VIKOR with an application to water resources planning , 2011, Expert Syst. Appl..
[93] Ying Jiang,et al. A Fuzzy Comprehensive Assessment System of Dam Failure Risk Based on Cloud Model , 2013, J. Comput..
[94] Hai Ning Yang,et al. The Application of Fuzzy Evaluation Method to Assess Safety Behavior of Xixia Reservoir Earthfill Dam , 2012 .
[95] Ulla Mörtberg,et al. A Spatial Multi-Criteria Analysis Approach for Locating Suitable Sites for Construction of Subsurface Dams in Northern Pakistan , 2014, Water Resources Management.
[96] Hui Peng,et al. The Comprehensive Safety Assessment of Earthfill Dam Based on Multi-stratum Fuzzy Evaluation , 2009, 2009 Second International Symposium on Computational Intelligence and Design.
[97] Kyle E. Juracek,et al. The Aging of America's Reservoirs: In‐Reservoir and Downstream Physical Changes and Habitat Implications , 2015 .
[98] John W. Labadie,et al. Optimal Operation of Multireservoir Systems: State-of-the-Art Review , 2004 .
[99] Miguel A. Mariño,et al. Fuzzy TOPSIS Multi-Criteria Decision Analysis Applied to Karun Reservoirs System , 2011 .
[100] V. Guinot,et al. A comparison of two conceptual models for the simulation of hydro-climatic variability over 50 years in a large Sudano-Sahelian catchment , 2010 .
[101] Binbin Tang,et al. A Study on Sequential Post Project Evaluation of Cascade Hydropower Stations Based on Multi-objective-AHP Decision-Making Model , 2014 .
[102] Youwei Qin,et al. Optimization of habitat protection area based on analytic hierarchy process (AHP) at Chongqing Reach in Wujiang Basin , 2011, 2011 International Conference on Remote Sensing, Environment and Transportation Engineering.
[103] Kevin Grant,et al. International Journal of Information Management , 2022 .
[104] Mohan Munasinghe,et al. Small hydropower projects and sustainable energy development in Sri Lanka , 2005 .
[105] Xiaoling Wang,et al. Study on the Gray Fuzzy Comprehensive Evaluation Model about Dam-Break Consequences , 2012 .
[106] M. H. Alipour,et al. Risk-Informed Decision Making Framework for Operating a Multi-Purpose Hydropower Reservoir During Flooding and High Inflow Events, Case Study: Cheakamus River System , 2015, Water Resources Management.
[107] Ke Xu,et al. Decision-Making for Ecological Reservoir Operation Based on Lamda Fuzzy Measures , 2009, 2009 Sixth International Conference on Fuzzy Systems and Knowledge Discovery.
[108] Li He,et al. Fuzzy constrained optimization of eco‐friendly reservoir operation using self‐adaptive genetic algorithm: a case study of a cascade reservoir system in the Yalong River, China , 2012 .
[109] Huan-Chun Lin,et al. Landscape Aesthetics Quality Estimation Method for Check Dams─Application of the Fuzzy Logic System , 2012 .
[110] Yun Na Wu,et al. Risk Analysis of Hydropower Construction Project Based on Fuzzy Comprehensive Evaluation , 2013 .
[111] G. Tangen. Methodological and organizational aspects of introducing MCDM for planning hydropower plant reconditioning , 1997, 1997 IEEE International Conference on Systems, Man, and Cybernetics. Computational Cybernetics and Simulation.
[112] Bojan Srdjevic,et al. Modelling Multicriteria Decision Making Process for Sharing Benefits from the Reservoir at Serbia-Romania Border , 2014, Water Resources Management.
[113] Hao Cao. Study on Evaluation Method for Sustainable Development of Reservoir Resettlement Based on Analytic Hierarchy Process , 2014 .
[114] Phanarut Srichetta,et al. Applying AHP to Evaluate Hydropower Projects of Lao PDR in Implementation of the Environmental Management and Monitoring Plan , 2014 .
[115] S. H. Fischer,et al. Analysing cushman dam , 2005 .
[116] Carlos A. Bana e Costa. Les problématiques de l'aide à la décision : vers l'enrichissement de la trilogie choix-tri-rangement , 1996 .
[117] Seyed Ali Jozi,et al. PHYSICAL RISK ANALYSIS OF CONSTRUCTION PHASE IN KHUZESTAN BALAROOD DAM IN IRAN USING MULTI-ATTRIBUTE DECISION MAKING METHOD , 2011 .
[118] Risako Morimoto,et al. Incorporating socio-environmental considerations into project assessment models using multi-criteria analysis: A case study of Sri Lankan hydropower projects , 2013 .
[119] Li Ming Chen,et al. The Evaluation Model of the Hydropower Project Financing Risk Based on AHP-RS and RBF Neural Network , 2011 .
[120] Choong-Sung Yi,et al. Water Allocation by Weighting Factors Considering Multiple Criteria , 2005 .
[121] Yang Haibo,et al. Landslide Risk Analysis of Miyun Reservoir Area Based on RS and GIS , 2011 .
[122] Wen-Chieh Chou,et al. Application of fuzzy theory and PROMETHEE technique to evaluate suitable ecotechnology method: A case study in Shihmen Reservoir Watershed, Taiwan , 2007 .
[123] Shouyun Liang,et al. Landslide Hazard Assessment Based on GIS: A Case Study of a Hydropower Station Area in China , 2008, 2008 International Workshop on Education Technology and Training & 2008 International Workshop on Geoscience and Remote Sensing.
[124] Víctor Yepes,et al. Social Sustainability in the Lifecycle of Chilean Public Infrastructure , 2016 .
[125] Jing-nan Sun,et al. Entropy method for determination of weight of evaluating indicators in fuzzy synthetic evaluation for water quality assessment. , 2006, Journal of environmental sciences.
[126] Bin Bin Tang,et al. Evaluation Research about the Post Environmental Impact Assessment of Cascade Hydropower Engineering which Based on Matter-Element and Analytic-Hierarchy Coupling Model , 2013 .
[127] Lu Mou,et al. The Application of Fuzzy Comprehensive Evaluation for Eutrophication Assessment of Plain Reservoirs: Take GengJing Reservoir as an Example , 2012, 2012 International Conference on Biomedical Engineering and Biotechnology.
[128] Darrell G. Fontane,et al. Multiple reservoir system operational planning using multi-criterion decision analysis , 1994 .
[129] José María Moreno-Jiménez,et al. A collaborative platform for cognitive decision making in the Knowledge Society , 2012, Comput. Hum. Behav..
[130] Miklas Scholz,et al. Ecological Environment Protection in Chinese Rural Hydropower Development Practices: A Review , 2012, Water, Air, & Soil Pollution.
[131] Andrea Castelletti,et al. Visualization-based multi-objective improvement of environmental decision-making using linearization of response surfaces , 2010, Environ. Model. Softw..
[132] Stefan Hajkowicz,et al. A Review of Multiple Criteria Analysis for Water Resource Planning and Management , 2007 .
[133] S Peng,et al. Application of improved AHP method and variable weight theory to rock mass quality evaluation , 2011 .
[134] Cathy Macharis,et al. Reviewing the Use of Multi-Criteria Decision Analysis for the Evaluation of Transport Projects: Time for a Multi-Actor Approach , 2015 .
[135] J. Burnham. Scopus database: a review , 2006, Biomedical digital libraries.
[136] Chang-qing Qi. Research on risk assessment of dam removal , 2010, 2010 International Conference on Future Information Technology and Management Engineering.
[137] Ioan Nistor,et al. Efficiency assessment of hydroelectric power plants in Canada: A multi criteria decision making approach , 2014 .
[138] Xi Xi,et al. A Novel Integrated Decision Support Tool for Sustainable Water Resources Management in Singapore: Synergies Between System Dynamics and Analytic Hierarchy Process , 2015, Water Resources Management.
[139] José Roberto Ribas,et al. An Assessment of Conflicting Intentions in the Use of Multipurpose Water Reservoirs , 2014, Water Resources Management.