Construction schedule early warning from the perspective of probability and visualization
暂无分享,去创建一个
[1] Raymond E. Levitt,et al. A method to automate look-ahead schedule (LAS) generation for the finishing phase of construction projects , 2013 .
[2] Jimmie Hinze,et al. Cost and Schedule Risk Analysis of Bridge Construction in Pakistan: Establishing Risk Guidelines , 2014 .
[3] Rafael Sacks,et al. Impact of three-dimensional parametric modeling of buildings on productivity in structural engineering practice , 2008 .
[4] Weisheng Lu,et al. Optimizing construction planning schedules by virtual prototyping enabled resource analysis , 2009 .
[5] Nan Li,et al. Improved Critical Chain Project Management Framework for Scheduling Construction Projects , 2014 .
[6] Raja R. A. Issa,et al. Nongeometric Building Information Needs Assessment for Facilities Management , 2016 .
[7] Jiuping Xu,et al. Control Risk for Multimode Resource-Constrained Project Scheduling Problems under Hybrid Uncertainty , 2015 .
[8] Jing Du,et al. Cost performance as a stochastic process: EAC projection by Markov chain simulation , 2016 .
[9] Kenneth T. Sullivan,et al. Project Risk Distribution during the Construction Phase of Small Building Projects , 2016 .
[10] Yun Le,et al. Incorporation of alternatives and importance levels in scheduling complex construction programs , 2015 .
[11] Yu Jia,et al. Construction schedule risk analysis of high roller-compacted concrete dams based on improved CSRAM , 2015 .
[12] Changmin Kim,et al. Automated construction progress measurement using a 4D building information model and 3D data , 2013 .
[13] Nuhu Braimah,et al. Understanding construction delay analysis and the role of pre-construction programming , 2014 .
[14] Ahmet Öztaş,et al. Uncertainty evaluation with fuzzy schedule risk analysis model in activity networks of construction projects , 2014 .
[15] Bon-Gang Hwang,et al. Green building projects: schedule performance, influential factors and solutions , 2015 .
[16] Llewellyn Tang,et al. Simulating Construction Duration for Multistory Buildings with Controlling Activities , 2013 .
[17] Jan Holmström,et al. BIM as Infrastructure in a Finnish HVAC Actor Network: Enabling Adoption, Reuse, and Recombination over a Building Life Cycle and between Projects , 2015 .
[18] Mario Vanhoucke,et al. Empirical Evaluation of Earned Value Management Forecasting Accuracy for Time and Cost , 2015 .
[19] Chengshuang Sun,et al. Study on BIM-based construction project cost and schedule risk early warning , 2015, J. Intell. Fuzzy Syst..
[20] Fletcher Griffis,et al. Automated Productivity-Based Schedule Animation: Simulation-Based Approach to Time-Cost Trade-Off Analysis , 2014 .
[21] Mengqi Zhao,et al. Robustness analysis of underground powerhouse construction simulation based on Markov Chain Monte Carlo method , 2016 .
[22] Luh-Maan Chang,et al. A framework for an automated and integrated project scheduling and management system , 2013 .
[23] Awad S. Hanna. Using the Earned Value Management System to Improve Electrical Project Control , 2012 .
[24] Leon A. H. M. van Berlo,et al. BIM on the construction site: providing hidden information on task specific drawings , 2015, J. Inf. Technol. Constr..
[25] Yong K. Cho,et al. Multiobjective Construction Schedule Optimization Using Modified Niched Pareto Genetic Algorithm , 2016 .
[26] Geoffrey Qiping Shen,et al. Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects , 2016 .
[27] Tao Guan,et al. Construction schedule optimization for high arch dams based on real-time interactive simulation , 2015 .
[28] David H. Wolpert,et al. Using Supervised Learning to Improve Monte Carlo Integral Estimation , 2011, ArXiv.
[29] Warit Wipulanusat,et al. Completion delay risk management: A dynamic risk insurance approach , 2014 .
[30] Pasit Lorterapong,et al. Construction Scheduling Using the Constraint Satisfaction Problem Method , 2013 .
[31] Liu Lu. MATLAB realization and optimization of network planning technology node parameters and the critical path , 2013 .