Development of finite capacity material requirement planning system for assembly operations
暂无分享,去创建一个
[1] Robert J Willis,et al. Schedule Based M.R.P.: An Integrated Approach to Production Scheduling and Material Requirements Planning , 1982 .
[2] Oliver W. Wight,et al. MRP II : unlocking America's productivity potential , 1981 .
[3] A. K. Kochhar. Development of Computer Based Production Systems , 1979 .
[4] John O. McClain,et al. Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction , 1983 .
[5] L. J. Thomas,et al. Heuristics for multilevel lot-sizing with a bottleneck , 1986 .
[6] Nils Arne Bakke,et al. The challenges of capacity planning , 1993 .
[7] P. C. Pandey,et al. A finite capacity material requirements planning system , 2000 .
[8] Martin Taal,et al. Integrating MRP and finite capacity planning , 1997 .
[9] L. J. Thomas,et al. Efficient Solutions to a Linear Programming Model for Production Scheduling With Capacity Constraints and No Initial Stock , 1989 .
[10] Chee-Chuong Sum,et al. A New Framework for Manufacturing Planning and Control Systems , 1993 .
[11] Pisal Yenradee. Application of optimized production technology in a capacity constrained flow shop: a case study in a battery factory , 1994 .
[12] Eliyahu M. Goldratt,et al. What is this thing called theory of constraints and how should it be implemented , 1990 .