An overview of design and operational issues of kanban systems
暂无分享,去创建一个
[1] Ronald G. Askin,et al. Production planning for a multi-item, single-stage kanban system , 1994 .
[2] Mehmet Savsar,et al. Effects of kanban withdrawal policies and other factors on the performance of JIT systems : a simulation study , 1996 .
[3] Mitsutoshi Kojima,et al. Optimal numbers of two kinds of kanbans in a JIT production system , 1995 .
[4] Asoo J. Vakharia,et al. Job and Family Scheduling of a Flow-Line Manufacturing Cell: A Simulation Study , 1991 .
[5] Uday S. Karmarkar,et al. Chapter 6 Manufacturing lead times, order release and capacity loading , 1993, Logistics of Production and Inventory.
[6] Henry C. Co,et al. A dynamic programming model for the kanban assignment problem in a multistage multiperiod production system , 1991 .
[7] S. Mittal,et al. Simulation of JIT production to determine number of Kanbans , 1992 .
[8] H Ohta,et al. The optimal operation planning of Kanban to minimize the total operation cost , 1988 .
[9] Loren Paul Rees,et al. Dynamically Adjusting the Number of Kanbans in a Just-in-Time Production System Using Estimated Values of Leadtime , 1987 .
[10] Rhonda R. Lummus. A simulation analysis of sequencing alternatives for JIT lines using kanbans , 1995 .
[11] Jonathan F. Bard,et al. Determining the number of kanbans in a multiproduct, multistage production system , 1991 .
[12] G. Ragatz,et al. A simulation analysis of due date assignment rules , 1984 .
[13] Loren Paul Rees,et al. A SIMULATION ANALYSIS OF THE JAPANESE JUST‐IN‐TIME TECHNIQUE (WITH KANBANS) FOR A MULTILINE, MULTISTAGE PRODUCTION SYSTEM , 1983 .
[14] Loren Paul Rees,et al. A mathematical programming approach for determining workcentre lotsizes in a just-in-time system with signal Kanbans , 1990 .
[15] Debasis Mitra,et al. Analysis of a Kanban discipline for cell coordination in production lines , 1990 .
[16] Gabriel R. Bitran,et al. A mathematical programming approach to a deterministic Kanban system , 1987 .
[17] Asoo J. Vakharia,et al. A robust design methodology for Kanban system design , 1997 .
[18] Blair J. Berkley,et al. A Simulation Study of Sequencing Rules in a Kanban‐Controlled Flow Shop* , 1991 .
[19] Hsu-Pin Wang,et al. Determining the number of kanbans: a step toward non-stock-production , 1990 .
[20] Uday S. Karmarkar,et al. Batching Policy in Kanban Systems , 1989 .
[21] Blair J. Berkley. Simulation Tests of FCFS and SPT Sequencing in Kanban Systems , 1993 .
[22] P. R. PHlLlPOO,et al. Simultaneously determining the number of kanbans, container sizes, and the final-assembly sequence of products in a just-in-time shop. , 1996 .
[23] Andrew Kusiak,et al. Overview of Kanban systems , 1996 .
[24] Mahesh Gupta,et al. A system dynamics model for a multi-stage multi-line dual-card JIT-kanban system , 1989 .
[25] B. J. Berkley. A simulation study of container size in two-card kanban systems , 1996 .
[26] M. S. Akturk,et al. Part-machine grouping using a multi-objective cluster analysis , 1996 .
[27] L. C. LEEj. Parametric appraisal of the JIT system , 1987 .
[28] Katsuhiko Takahashi. Determining the number of Kanbans for unbalanced serial production systems , 1994 .
[29] Yasuhiro Monden,et al. “A SIMULATION ANALYSIS OF THE JAPANESE JUST‐IN‐TIME TECHNIQUE (WITH KANBANS) FOR A MULTILINE, MULTISTAGE PRODUCTION SYSTEM”: A COMMENT* , 1984 .