An overview of design and operational issues of kanban systems

We present a literature review and classification of techniques to determine both the design parameters and kanban sequences for just-in-time manufacturing systems. We summarize the model structures, decision variables, performance measures and assumptions in a tabular format. It is important to state that there is a significant relationship between the design parameters, such as the number of kanbans and kanban sizes, and the scheduling decisions in a multiitem, multi-stage, multi-horizon kanban system. An experimental design is developed to evaluate the impact of operational issues, such as sequencing rules and actual lead times on the design parameters.

[1]  Ronald G. Askin,et al.  Production planning for a multi-item, single-stage kanban system , 1994 .

[2]  Mehmet Savsar,et al.  Effects of kanban withdrawal policies and other factors on the performance of JIT systems : a simulation study , 1996 .

[3]  Mitsutoshi Kojima,et al.  Optimal numbers of two kinds of kanbans in a JIT production system , 1995 .

[4]  Asoo J. Vakharia,et al.  Job and Family Scheduling of a Flow-Line Manufacturing Cell: A Simulation Study , 1991 .

[5]  Uday S. Karmarkar,et al.  Chapter 6 Manufacturing lead times, order release and capacity loading , 1993, Logistics of Production and Inventory.

[6]  Henry C. Co,et al.  A dynamic programming model for the kanban assignment problem in a multistage multiperiod production system , 1991 .

[7]  S. Mittal,et al.  Simulation of JIT production to determine number of Kanbans , 1992 .

[8]  H Ohta,et al.  The optimal operation planning of Kanban to minimize the total operation cost , 1988 .

[9]  Loren Paul Rees,et al.  Dynamically Adjusting the Number of Kanbans in a Just-in-Time Production System Using Estimated Values of Leadtime , 1987 .

[10]  Rhonda R. Lummus A simulation analysis of sequencing alternatives for JIT lines using kanbans , 1995 .

[11]  Jonathan F. Bard,et al.  Determining the number of kanbans in a multiproduct, multistage production system , 1991 .

[12]  G. Ragatz,et al.  A simulation analysis of due date assignment rules , 1984 .

[13]  Loren Paul Rees,et al.  A SIMULATION ANALYSIS OF THE JAPANESE JUST‐IN‐TIME TECHNIQUE (WITH KANBANS) FOR A MULTILINE, MULTISTAGE PRODUCTION SYSTEM , 1983 .

[14]  Loren Paul Rees,et al.  A mathematical programming approach for determining workcentre lotsizes in a just-in-time system with signal Kanbans , 1990 .

[15]  Debasis Mitra,et al.  Analysis of a Kanban discipline for cell coordination in production lines , 1990 .

[16]  Gabriel R. Bitran,et al.  A mathematical programming approach to a deterministic Kanban system , 1987 .

[17]  Asoo J. Vakharia,et al.  A robust design methodology for Kanban system design , 1997 .

[18]  Blair J. Berkley,et al.  A Simulation Study of Sequencing Rules in a Kanban‐Controlled Flow Shop* , 1991 .

[19]  Hsu-Pin Wang,et al.  Determining the number of kanbans: a step toward non-stock-production , 1990 .

[20]  Uday S. Karmarkar,et al.  Batching Policy in Kanban Systems , 1989 .

[21]  Blair J. Berkley Simulation Tests of FCFS and SPT Sequencing in Kanban Systems , 1993 .

[22]  P. R. PHlLlPOO,et al.  Simultaneously determining the number of kanbans, container sizes, and the final-assembly sequence of products in a just-in-time shop. , 1996 .

[23]  Andrew Kusiak,et al.  Overview of Kanban systems , 1996 .

[24]  Mahesh Gupta,et al.  A system dynamics model for a multi-stage multi-line dual-card JIT-kanban system , 1989 .

[25]  B. J. Berkley A simulation study of container size in two-card kanban systems , 1996 .

[26]  M. S. Akturk,et al.  Part-machine grouping using a multi-objective cluster analysis , 1996 .

[27]  L. C. LEEj Parametric appraisal of the JIT system , 1987 .

[28]  Katsuhiko Takahashi Determining the number of Kanbans for unbalanced serial production systems , 1994 .

[29]  Yasuhiro Monden,et al.  “A SIMULATION ANALYSIS OF THE JAPANESE JUST‐IN‐TIME TECHNIQUE (WITH KANBANS) FOR A MULTILINE, MULTISTAGE PRODUCTION SYSTEM”: A COMMENT* , 1984 .