Proton beam verification using RF power measurement data for a cw radiofrequency quadrupole linac
暂无分享,去创建一个
D. R. Keffeler | A. S. Bolt | T. Hardek | J. Kamperschroer | P. Balleyguier | L. Young | T. Zaugg | J. Sherman | G. Bolme | D. Hodgkins | M. Richards | A. Arvin | L. Hansborough | R. Stevens | H. Smith
[1] L. Young,et al. Comparison of beam simulations with measurements for a 1.25-MeV, CW RFQ , 1998 .
[2] E. A. Meyer,et al. Status report on a dc 130 mA, 75 keV proton injector (invited) , 1997 .
[3] D. R. Keffeler,et al. High-power RF operations studies with the CRITS RFQ , 1995, Proceedings Particle Accelerator Conference.
[4] G. E. McMichael,et al. Operation of a high-power CW klystrode with the RFQ1 facility , 1993, Proceedings of International Conference on Particle Accelerators.
[5] K. Johnson,et al. MEASUREMENT OF RF ACCELERATOR CAVITY FIELD LEVELS AT HIGH POWER FROM X-RAY EMISSIONS· , 1990 .