Examining the effect of adverse geological conditions on jamming of a single shielded TBM in Uluabat tunnel using numerical modeling

Abstract Severe shield jamming events have been reported during excavation of Uluabat tunnel through adverse geological conditions, which resulted in several stoppages at advancing a single shielded tunnel boring machine (TBM). To study the jamming mechanism, three-dimensional (3D) simulation of the machine and surrounding ground was implemented using the finite difference code FLAC3D. Numerical analyses were performed for three sections along the tunnel with a higher risk for entrapment due to the combination of overburden and geological conditions. The computational results including longitudinal displacement contours and ground pressure profiles around the shield allow a better understanding of ground behavior within the excavation. Furthermore, they allow realistically assessing the impact of adverse geological conditions on shield jamming. The calculated thrust forces, which are required to move the machine forward, are in good agreement with field observations and measurements. It also proves that the numerical analysis can effectively be used for evaluating the effect of adverse geological environment on TBM entrapments and can be applied to prediction of loads on the shield and pre-estimating of the required thrust force during excavation through adverse ground conditions.

[1]  Riccardo Castellanza,et al.  Development and validation of a 3D numerical model for TBM–EPB mechanised excavations , 2012 .

[2]  Murad Y. Abu-Farsakh,et al.  Computational model for the simulation of the shield tunneling process in cohesive soils , 1999 .

[3]  J. Schmitt,et al.  Spannungsverformungsverhalten des Gebirges beim Vortrieb mit Tunnelbohrmaschinen mit Schild , 2009 .

[4]  Hussein Mroueh,et al.  A simplified 3D model for tunnel construction using tunnel boring machines , 2008 .

[5]  S. Bernat,et al.  SOIL-STRUCTURE INTERACTION IN SHIELD TUNNELLING IN SOFT SOIL , 1998 .

[6]  Charles E. Augarde,et al.  Three‐dimensional finite element analysis of lined tunnels , 2001 .

[7]  Giovanni Battista Barla,et al.  A Completely 3D Model for the Simulation of Mechanized Tunnel Excavation , 2012, Rock Mechanics and Rock Engineering.

[8]  Günther Meschke,et al.  A 3D finite element simulation model for TBM tunnelling in soft ground , 2004 .

[9]  J. M. Rodríguez,et al.  Prediction and analysis of subsidence induced by shield tunnelling in the Madrid Metro extension , 2002 .

[10]  Günther Meschke,et al.  A numerical study of the effect of soil and grout material properties and cover depth in shield tunnelling , 2006 .

[11]  Georg Anagnostou,et al.  Thrust force requirements for TBMs in squeezing ground , 2010 .

[12]  Jamal Rostami,et al.  Impact of Overcut on Interaction Between Shield and Ground in the Tunneling with a Double-shield TBM , 2015, Rock Mechanics and Rock Engineering.

[13]  G. Wayne Clough,et al.  Evaluation of Soil Response to EPB Shield Tunneling , 1985 .

[14]  Georgios Anagnostou,et al.  The Effect of the Stress Path on Squeezing Behavior in Tunneling , 2009 .

[15]  Georgios Anagnostou,et al.  Numerical Analysis of the Development of Squeezing Pressure During TBM Standstills , 2007 .

[16]  Rohola Hasanpour,et al.  Evaluation of surface settlements in the Istanbul metro in terms of analytical, numerical and direct measurements , 2012, Bulletin of Engineering Geology and the Environment.

[17]  Nuh Bilgin,et al.  The performance of a TBM in a squeezing ground at Uluabat, Turkey , 2012 .

[18]  Bahtiyar Ünver,et al.  Analysis of interaction between tunnels in soft ground by 3D numerical modeling , 2011 .

[19]  Annamaria Cividini Application of Numerical Methods to Geotechnical Problems , 1998 .

[20]  Ebrahim Farrokh,et al.  Correlation of tunnel convergence with TBM operational parameters and chip size in the Ghomroud tunnel, Iran , 2008 .

[21]  Malcolm D. Bolton,et al.  FINITE ELEMENT MODELLING OF EXCAVATION AND ADVANCEMENT PROCESSES OF A SHIELD TUNNELLING MACHINE , 1999 .

[22]  R. Ribacchi,et al.  3D-Modelling of TBM excavation in squeezing rock masses , 2007 .

[23]  Luís Lamas,et al.  International Society for Rock Mechanics – ISRM , 2017 .

[24]  Daniel Dias,et al.  Three dimensional simulation of slurry shield tunnelling , 2014 .

[25]  Giovanni Battista Barla,et al.  Impact of Advance Rate on Entrapment Risk of a Double-Shielded TBM in Squeezing Ground , 2015, Rock Mechanics and Rock Engineering.

[26]  R. Kastner,et al.  Geotechnical Aspects of Underground Construction in Soft Ground , 2002 .

[27]  Rohola Hasanpour,et al.  Advance numerical simulation of tunneling by using a double shield TBM , 2014 .

[28]  Jamal Rostami,et al.  3D finite difference model for simulation of double shield TBM tunneling in squeezing grounds , 2014 .

[29]  Francesco Amberg,et al.  Numerical simulations of tunnelling in soft rock under water pressure , 2009 .

[30]  R. K. Rowe,et al.  AN ANALYSIS OF THREE-DIMENSIONAL GROUND MOVEMENTS: THE THUNDER BAY TUNNEL , 1991 .

[31]  B. F. J. van Dijk,et al.  3-D Geotechnical Model for the North/Southline in Amsterdam , 1998 .

[32]  Günther Meschke,et al.  On the influence of face pressure, grouting pressure and TBM design in soft ground tunnelling , 2006 .