Operation Analysis of The Region Network From Nanshe Substation to Old No.2 Taiyuan Power Plant

In view of the changed operation mode of the region network from Nanshe Substation to the Old Second Power Plant in Taiyuan,the network operation analysis of normal and fault situation is proposed in this paper.Some suggestions about overhauling mode arranging,accident settling and power network connection diagram improving for this region when electromagnetic ringlike network is untied are put forward.