Smarter ways to provide grid connections for renewable generators
暂无分享,去创建一个
[1] Allan Collinson,et al. SOLUTIONS FOR THE CONNECTION AND OPERATION OF DISTRIBUTED GENERATION , 2003 .
[2] Alan Creighton,et al. On site trial of the new SuperTAPP N+ AVC relay — A step towards an active network , 2008 .
[3] Janusz Bialek,et al. Tracing the flow of electricity , 1996 .
[4] Goran Strbac,et al. Maximising penetration of wind generation in existing distribution networks , 2002 .
[5] Sara White. Active local distribution network management for embedded generation , 2005 .
[6] Andrea Michiorri,et al. Forecasting real-time ratings for electricity distribution networks using weather forecast data , 2009 .
[7] Graham Ault,et al. Active power flow management to facilitate increased connection of renewable and distributed generation to rural distribution networks , 2007 .
[8] Graham Ault,et al. TECHNIQUES FOR MANAGING POWER FLOWS IN ACTIVE DISTRIBUTION NETWORKS WITHIN THERMAL CONSTRAINTS , 2009 .
[9] James R. McDonald,et al. Exploiting intelligent systems techniques within an autonomous regional active network management system , 2009, 2009 IEEE Power & Energy Society General Meeting.
[10] Goran Strbac,et al. Contributions of individual generators to loads and flows , 1997 .
[11] J. R. McDonald,et al. An architecture for flexible and autonomous network management systems , 2009 .
[12] Andrea Michiorri,et al. Dynamic thermal rating and active control for improved distribution network utilisation , 2010 .
[13] Graham Ault,et al. Active power-flow management utilising operating margins for the increased connection of distributed generation , 2007 .
[14] J.R. McDonald,et al. Actively Managing Wind Farm Power Output , 2008, IEEE Transactions on Power Systems.
[15] Phil Taylor,et al. Strategies for the control of multiple distributed generation schemes , 2009 .
[16] Graham Ault,et al. Methodology for determination of economic connection capacity for renewable generator connections to distribution networks optimised by active power flow management , 2006 .
[17] Janusz Bialek,et al. Generation curtailment to manage voltage constraints in distribution networks , 2007 .
[18] C.D. Vournas,et al. Application of interruptible contracts to increase wind-power penetration in congested areas , 2004, IEEE Transactions on Power Systems.