Coordination policy for production and delivery scheduling in the closed loop supply chain

Coordinating a supply chain necessitates a synchronization strategy for reordering products and a cost-effective production and replenishment cycle time. The aim of this paper is to present an optimization framework for producing and distribution in the supply chains with a cooperating strategy. The main contribution of this paper is to integrate closed loop supply chain with open-shop manufacturing and economic lot and delivery scheduling problem (ELDSP). This integration is applied with the aim of better coordination between the members of the supply chain. This study examines the ELDSP for a multi-stage closed loop supply chain, where each product is returned to a manufacturing center at a constant rate of demand. The supply chain is also characterized by a sub-open-shop system for remanufacturing returned items. Common cycle time and multiplier policies is adopted to accomplish the desired synchronization. For this purpose, we developed a mathematical model in which a manufacturer with an open-shop system purchases raw materials from suppliers, converts them into final products, and sends them to package companies. Given that the ELDSPR is an NP-hard problem, a simulated annealing (SA) algorithm and a biography-based optimization (BBO) algorithm is developed. Two operational scenarios are formulated for the simulated annealing algorithm, after which both the algorithms are used to solve problems of different scales. The numerical results show that the biography-based optimization algorithm excellently performs in finding the best solution to the ELDSPR.

[1]  Ilkyeong Moon,et al.  A time-varying lot sizes approach for the economic lot scheduling problem with returns , 2016 .

[2]  Kudret Demirli,et al.  Economic lot and delivery scheduling problem for multi-stage supply chains , 2012 .

[3]  Saeid Rezaei,et al.  Applying forward and reverse cross-docking in a multi-product integrated supply chain network , 2017, Prod. Eng..

[4]  I ScottKirkpatrick Optimization by Simulated Annealing: Quantitative Studies , 1984 .

[5]  Reza Tavakkoli-Moghaddam,et al.  Mixed-integer linear programming model for tree-like pipeline scheduling problem with intermediate due dates on demands , 2020, Oper. Res..

[6]  Taebok Kim,et al.  Joint economic procurement—production–delivery policy for multiple items in a single-manufacturer, multiple-retailer system , 2006 .

[7]  Hamid Davoudpour,et al.  A hybrid imperialist competitive algorithm for solving economic lot and delivery scheduling problem in a four-stage supply chain , 2017 .

[8]  Matthias Schmidt,et al.  The Hanoverian Supply Chain Model: modelling the impact of production planning and control on a supply chain’s logistic objectives , 2017, Production Engineering.

[9]  Scott Kirkpatrick,et al.  Optimization by simulated annealing: Quantitative studies , 1984 .

[10]  Ching-Hsin Wang,et al.  Biogeography-based optimization based on population competition strategy for solving the substation location problem , 2018, Expert Syst. Appl..

[11]  Candace Arai Yano,et al.  The economic lot and delivery scheduling problem: models for nested schedules , 1995 .

[12]  Ruhul A. Sarker,et al.  A genetic algorithm for solving economic lot size scheduling problem , 2002 .

[13]  Heinrich Kuhn,et al.  An exact algorithm for solving the economic lot and supply scheduling problem using a power-of-two policy , 2014, Comput. Oper. Res..

[14]  Seyyed M. T. Fatemi Ghomi,et al.  Production , Manufacturing and Logistics A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains , 2006 .

[15]  M. Khouja,et al.  Synchronization in supply chains: implications for design and management , 2003, J. Oper. Res. Soc..

[16]  Wenyih Lee A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods delivering , 2005 .

[17]  A. Jabbarzadeh,et al.  Accelerated Cuckoo Optimization Algorithm for Capacitated Vehicle Routing Problem in Competitive Conditions , 2018 .

[18]  Dan Simon,et al.  Biogeography-Based Optimization , 2022 .

[19]  Dincer Konur,et al.  Economic and Environmental Considerations in a Stochastic Inventory Control Model with Order Splitting under Different Delivery Schedules among Suppliers , 2017 .

[20]  Jens Clausen,et al.  A hybrid algorithm for solving the economic lot and delivery scheduling problem in the common cycle case , 2006, Eur. J. Oper. Res..

[21]  Seyed Ali Torabi,et al.  Multiple cycle economic lot and delivery-scheduling problem in a two-echelon supply chain , 2009 .

[22]  M. Khouja The economic lot and delivery scheduling problem: common cycle, rework, and variable production rate , 2000 .

[23]  Moutaz Khouja,et al.  An optimal polynomial time algorithm for the common cycle economic lot and delivery scheduling problem , 2004, Eur. J. Oper. Res..

[24]  Hing Kai Chan,et al.  Recent research trend of economic‐lot scheduling problems , 2013 .

[25]  R. Tavakkoli-Moghaddam,et al.  Solving the economic lot and delivery scheduling problem in a flexible job shop with unrelated parallel machines and a shelf life by a proposed hybrid PSO , 2013 .

[26]  Kudret Demirli,et al.  A bilinear goal programming model and a modified Benders decomposition algorithm for supply chain reconfiguration and supplier selection , 2010 .