Coordination policy for production and delivery scheduling in the closed loop supply chain
暂无分享,去创建一个
[1] Ilkyeong Moon,et al. A time-varying lot sizes approach for the economic lot scheduling problem with returns , 2016 .
[2] Kudret Demirli,et al. Economic lot and delivery scheduling problem for multi-stage supply chains , 2012 .
[3] Saeid Rezaei,et al. Applying forward and reverse cross-docking in a multi-product integrated supply chain network , 2017, Prod. Eng..
[4] I ScottKirkpatrick. Optimization by Simulated Annealing: Quantitative Studies , 1984 .
[5] Reza Tavakkoli-Moghaddam,et al. Mixed-integer linear programming model for tree-like pipeline scheduling problem with intermediate due dates on demands , 2020, Oper. Res..
[6] Taebok Kim,et al. Joint economic procurement—production–delivery policy for multiple items in a single-manufacturer, multiple-retailer system , 2006 .
[7] Hamid Davoudpour,et al. A hybrid imperialist competitive algorithm for solving economic lot and delivery scheduling problem in a four-stage supply chain , 2017 .
[8] Matthias Schmidt,et al. The Hanoverian Supply Chain Model: modelling the impact of production planning and control on a supply chain’s logistic objectives , 2017, Production Engineering.
[9] Scott Kirkpatrick,et al. Optimization by simulated annealing: Quantitative studies , 1984 .
[10] Ching-Hsin Wang,et al. Biogeography-based optimization based on population competition strategy for solving the substation location problem , 2018, Expert Syst. Appl..
[11] Candace Arai Yano,et al. The economic lot and delivery scheduling problem: models for nested schedules , 1995 .
[12] Ruhul A. Sarker,et al. A genetic algorithm for solving economic lot size scheduling problem , 2002 .
[13] Heinrich Kuhn,et al. An exact algorithm for solving the economic lot and supply scheduling problem using a power-of-two policy , 2014, Comput. Oper. Res..
[14] Seyyed M. T. Fatemi Ghomi,et al. Production , Manufacturing and Logistics A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains , 2006 .
[15] M. Khouja,et al. Synchronization in supply chains: implications for design and management , 2003, J. Oper. Res. Soc..
[16] Wenyih Lee. A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods delivering , 2005 .
[17] A. Jabbarzadeh,et al. Accelerated Cuckoo Optimization Algorithm for Capacitated Vehicle Routing Problem in Competitive Conditions , 2018 .
[18] Dan Simon,et al. Biogeography-Based Optimization , 2022 .
[19] Dincer Konur,et al. Economic and Environmental Considerations in a Stochastic Inventory Control Model with Order Splitting under Different Delivery Schedules among Suppliers , 2017 .
[20] Jens Clausen,et al. A hybrid algorithm for solving the economic lot and delivery scheduling problem in the common cycle case , 2006, Eur. J. Oper. Res..
[21] Seyed Ali Torabi,et al. Multiple cycle economic lot and delivery-scheduling problem in a two-echelon supply chain , 2009 .
[22] M. Khouja. The economic lot and delivery scheduling problem: common cycle, rework, and variable production rate , 2000 .
[23] Moutaz Khouja,et al. An optimal polynomial time algorithm for the common cycle economic lot and delivery scheduling problem , 2004, Eur. J. Oper. Res..
[24] Hing Kai Chan,et al. Recent research trend of economic‐lot scheduling problems , 2013 .
[25] R. Tavakkoli-Moghaddam,et al. Solving the economic lot and delivery scheduling problem in a flexible job shop with unrelated parallel machines and a shelf life by a proposed hybrid PSO , 2013 .
[26] Kudret Demirli,et al. A bilinear goal programming model and a modified Benders decomposition algorithm for supply chain reconfiguration and supplier selection , 2010 .