Time and cost overruns in the UAE construction industry: a critical analysis

Abstract Time and cost are the two main indicators of success in a construction project as it affects all the project participants with equal positive and negative effects. Yet, poor time and cost performance have been a critical issue prevailing in the global construction market and UAE have not been an exception. This research adopted a concurrent mixed-methods approach, utilizing a questionnaire and an interview with UAE construction professionals, to analyse the major causes of this poor time and cost performance. The top five causes for time overrun were concluded as design variation from client and consultant, unrealistic schedules and completion dates projected by clients, delay in obtaining government permits and approvals, inaccurate time estimation by the consultants and change orders from clients. Whereas, the top five causes of cost overrun were summarized as design variation, poor cost estimation, delay in client’s decision-making process, financial constraints of client and inappropriate procurement method.

[1]  Murali Sambasivan,et al.  Causes and effects of delays in Malaysian construction industry , 2007 .

[2]  Lynn Crawford,et al.  Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study , 2003 .

[3]  Janaka Yasantha Ruwanpura,et al.  Simulation tool for manpower forecast loading and resource leveling , 2007, 2007 Winter Simulation Conference.

[4]  D. A. R. Dolage,et al.  Causes of time overrun in construction phase of building projects : a case study on Department of Engineering Services of Sabaragamuwa Provincial Council , 2013 .

[5]  Donald R. Cooper,et al.  Business Research Methods , 1980 .

[6]  Young Dai Lee,et al.  Critical construction conflicting factors identification using analytical hierarchy process , 2006 .

[7]  Sameh M. El-Sayegh,et al.  Significant factors causing delay in the UAE construction industry , 2006 .

[8]  Z. Ren,et al.  ROOT CAUSES OF CONSTRUCTION PROJECT DELAYS IN DUBAI , 2008 .

[9]  Mohan M. Kumaraswamy,et al.  Delays and cost overruns in the construction projects in the Gaza Strip , 2009 .

[10]  A critical review of the causes of cost overrun in construction industries in developing countries , 2017 .

[11]  Tatiana Rina Puspasari Factors causing the poor performance of construction project , 2005 .

[12]  John W. Creswell,et al.  Research Design: Qualitative, Quantitative, and Mixed Methods Approaches , 2010 .

[13]  Long Le-Hoai,et al.  Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries , 2008 .

[14]  Albert P.C. Chan,et al.  Key performance indicators for measuring construction success , 2004 .

[15]  Bernadette Sunjka,et al.  Significant Causes and Effects of Project Delays in the Niger Delta Region, Nigeria , 2013 .

[16]  S. El-Sayegh Risk assessment and allocation in the UAE construction industry , 2008 .

[17]  Rafael Sacks,et al.  Towards a New Understanding of the Construction Industry and the Nature of Its Production , 2007 .

[18]  Stephen O. Ogunlana,et al.  Problems causing delays in major construction projects in Thailand , 2008 .

[19]  Andrew D.F. Price,et al.  Modelling global risk factors affecting construction cost performance , 2003 .

[20]  Susan Greener,et al.  Business Research Methods , 2008 .

[21]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[22]  Ismail Abdul Rahman,et al.  Preliminary Study on Causative Factors Leading to Construction Cost Overrun , 2011 .

[23]  Peter Vogelius,et al.  Proceedings of the 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester. UK, Association of Researchers in Construction Management , 2016 .

[24]  Shaikh Asif Abdus Saeed Delay to Projects - Cause, Effect and Measures to Reduce/Eliminate Delay by Mitigation/Acceleration , 2009 .

[25]  N. Kartam,et al.  Delays and cost increases in the construction of private residential projects in Kuwait , 2005 .