A Discrete-event Modeling of ARGESIM Benchmark C20 'Complex Production System' using Flexsim Simulation Software
暂无分享,去创建一个
ARGESIM proposes a new benchmark description ARGESIM C20 ‘Complex Production System’. This article describes a first implementation of this benchmark by use of the simulation software Flexsim. The simulation model is controlled by a heterarchical control algorithm implemented in Flexsim, which covers routing and scheduling and is based on reservations. The results are presented according to the requirements of the benchmark description.
[1] Alexander Fay,et al. ARGESIM Benchmark C20 'Complex Production System' - Definition and Call , 2011, Simul. Notes Eur..