Soil Gas Survey and Well Installation at the 618-10 Burial Ground, 300-FF-5 Operable Unit, Hanford Site, Washington
暂无分享,去创建一个
This report describes the results of the soil gas survey and provides the details of the installation of the two new groundwater monitoring wells at the 618-10 burial ground.
[1] Harry D. Harmon,et al. 100-BC-5 Operable Unit Sampling and Analysis Plan , 2002 .
[2] Khris B. Olsen,et al. Measurement of Helium-3/Helium-4 Ratios in Soil Gas at the 618-11 Burial Ground , 2001 .
[3] D. H. Deford. 200-UP-2 Operable Unit technical baseline report , 1991 .