Resource allocation in dynamic PERT networks with finite capacity
暂无分享,去创建一个
Saeed Yaghoubi | Siamak Noori | Amir Azaron | Reza Tavakkoli-Moghaddam | R. Tavakkoli-Moghaddam | A. Azaron | S. Yaghoubi | S. Noori
[1] Philip M. Wolfe,et al. Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach , 1969 .
[2] María Pilar Tormos,et al. A multicriteria heuristic method to improve resource allocation in multiproject scheduling , 2000, Eur. J. Oper. Res..
[3] Amir Azaron,et al. Distribution function of the shortest path in networks of queues , 2005, OR Spectr..
[4] Tien-Fu Liang,et al. Fuzzy multi-objective project management decisions using two-phase fuzzy goal programming approach , 2009, Comput. Ind. Eng..
[5] Amir Azaron,et al. Time-cost trade-off via optimal control theory in Markov PERT networks , 2007, Ann. Oper. Res..
[6] Avraham Shtub,et al. Resource allocation in stochastic, finite-capacity, multi-project systems through the cross entropy methodology , 2007, J. Sched..
[7] R P Byali,et al. CRITICAL CHAIN PROJECT MANAGEMENT - A NEW PROJECT MANAGEMENT PHILOSOPHY FOR MULTI PROJECT ENVIRONMENT , 2008 .
[8] Richard F. Deckro,et al. A heuristic for multi-project scheduling with limited resources in the housing industry , 1990 .
[9] John H Payne,et al. Management of multiple simultaneous projects: a state-of-the-art review , 1995 .
[10] Amir Azaron,et al. A multi-objective resource allocation problem in PERT networks , 2006, Eur. J. Oper. Res..
[11] Y Ying,et al. HYBRID GENETIC ALGORITHM FOR RESOURCE CONSTRAINED MULTIPROJECT SCHEDULING PROBLEM , 2009 .
[12] Ali Kaveh,et al. Nondominated Archiving Multicolony Ant Algorithm in Time-Cost Trade-Off Optimization , 2009 .
[13] J. D. Wiest,et al. A Heuristic Model for Scheduling Large Projects with Limited Resources , 1967 .
[14] Cunbin Li,et al. The risk element transmission theory research of multi-objective risk-time-cost trade-off , 2009, Comput. Math. Appl..
[15] H. T. Papadopoulos,et al. Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines , 1996 .
[16] Dirk P. Kroese,et al. Cross‐Entropy Method , 2011 .
[17] Vidyadhar G. Kulkarni,et al. Markov and Markov-Regenerative pert Networks , 1986, Oper. Res..
[18] Jesús R. Artalejo,et al. Accessible bibliography on retrial queues , 1999 .
[19] Mark A. Turnquist,et al. Managing Portfolios of Projects under Uncertainty , 2004, Ann. Oper. Res..
[20] K. Raja,et al. Multi-project scheduling using an heuristic and a genetic algorithm , 2006 .
[21] Vincent Y.X. Chen,et al. A 0–1 goal programming model for scheduling multiple maintenance projects at a copper mine , 1994 .
[22] Stanley B. Gershwin,et al. Analysis of a general Markovian two-stage continuous-flow production system with a finite buffer , 2009 .
[23] Paul S. Adler,et al. From project to process management: an empirically-based framework for analyzing product development time , 1995 .
[24] Po-Han Chen,et al. Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints , 2009 .
[25] María Pilar Tormos,et al. Analysis of Scheduling Schemes and Heuristic Rules Performance in Resource-Constrained Multiproject Scheduling , 2001, Ann. Oper. Res..
[26] Armin Scholl,et al. Managing and modelling general resource transfers in (multi-)project scheduling , 2010, OR Spectr..
[27] Amir Azaron,et al. Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach , 2007, Eur. J. Oper. Res..
[28] I. Kurtulus,et al. Multi-Project Scheduling: Categorization of Heuristic Rules Performance , 1982 .
[29] Harry G. Perros,et al. Queueing networks with blocking: a bibliography , 1984, PERV.
[30] Michel Bierlaire,et al. An analytic finite capacity queueing network model capturing the propagation of congestion and blocking , 2009, Eur. J. Oper. Res..
[31] Yves Dallery,et al. Queueing models for full-flexible multi-class call centers with real-time anticipated delays , 2009 .
[32] Dirk P. Kroese,et al. The Cross-Entropy Method: A Unified Approach to Combinatorial Optimization, Monte-Carlo Simulation and Machine Learning , 2004 .
[33] Zong Woo Geem,et al. Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search , 2010 .
[34] Chandrasekharan Rajendran,et al. Performance analysis of scheduling rules in resource–constrained multiple projects , 2009 .
[35] Boaz Golany,et al. Managing multi-project environments through constant work-in-process , 2003 .
[36] Paola Inverardi,et al. A review on queueing network models with finite capacity queues for software architectures performance prediction , 2003, Perform. Evaluation.
[37] S.M.T. Fatemi Ghomi,et al. A simulation model for multi-project resource allocation , 2002 .
[38] Subhash C. Narula,et al. Multi-Project Scheduling: Analysis of Project Performance , 1985 .
[39] Mauricio G. C. Resende,et al. A genetic algorithm for the resource constrained multi-project scheduling problem , 2008, Eur. J. Oper. Res..
[40] Avraham Shtub,et al. Managing Stochastic, Finite Capacity, Multi-Project Systems through the Cross-Entropy Methodology , 2005, Ann. Oper. Res..