A Mockup Stochastic Program to Study the Impact of Design Uncertainty on ETO Shipbuilding Planning
暂无分享,去创建一个
[1] Hajnalka Vaagen,et al. A Multidisciplinary Framework for Robust Planning and Decision-Making in Dynamically Changing Engineering Construction Projects , 2014, APMS.
[2] Peter W. G. Morris,et al. The management of projects , 1994 .
[3] David M. Wall,et al. Distributions and correlations in Monte Carlo simulation , 1997 .
[4] Jan Emblemsvåg,et al. Lean Project Planning in Shipbuilding , 2014 .
[5] John R. Schuyler,et al. Risk and Decision Analysis in Projects , 2001 .
[6] Stein W. Wallace,et al. Improving project cost estimation by taking into account managerial flexibility , 2000, Eur. J. Oper. Res..
[7] S. Wallace,et al. Product variety arising from hedging in the fashion supply chains , 2008 .
[8] Alan J. King,et al. Modeling with Stochastic Programming , 2012 .
[9] Teodor Gabriel Crainic,et al. A Study of Demand Stochasticity in Service Network Design , 2009, Transp. Sci..
[10] Michal Kaut,et al. Modelling consumer directed substitution , 2011 .