Reliability, availability and maintainability analysis of the conveyor system in mechanized tunneling
暂无分享,去创建一个
Mohsen Hajihassani | S. Moosazadeh | S. Ahmadi | H. Moomivand | M. M. Rajaei | M. Hajihassani | H. Moomivand | S. Moosazadeh | S. Ahmadi | M. Rajaei
[1] Uday Kumar,et al. Reliability analysis of drum shearer machine at mechanized longwall mines , 2012 .
[2] Alyson G. Wilson,et al. Repairable System Reliability , 2008 .
[3] Balbir S. Dhillon,et al. Mining Equipment Reliability, Maintainability, and Safety , 2008 .
[4] Bijan Sarkar,et al. RELIABILITY ANALYSIS OF SHOVEL MACHINES USED IN AN OPEN CAST COAL MINE , 2001 .
[5] Aminaton Marto,et al. Predicting tunnel boring machine performance through a new model based on the group method of data handling , 2018, Bulletin of Engineering Geology and the Environment.
[6] Behzad Ghodrati,et al. RAM analysis of earth pressure balance tunnel boring machines: A case study , 2015 .
[7] Marcantonio Catelani,et al. Sensitivity analysis with MC simulation for the failure rate evaluation and reliability assessment , 2015 .
[8] J. Barabady,et al. Criticality analysis from maintainability point of view , 2017, 2017 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM).
[9] Mohammad Modarres,et al. Reliability engineering and risk analysis : a practical guide , 2016 .
[10] Laeeque K. Daneshmend,et al. Reliability Modelling of Surface Mining Equipment: Data Gathering and Analysis Methodologies , 2003 .
[11] Herbert H. Einstein,et al. Reliability analysis of roof wedges and rockbolt forces in tunnels , 2013 .
[12] Behzad Ghodrati,et al. Simulation of tunnel boring machine utilization: A case study , 2018 .
[13] Furuly Simon,et al. Availability analysis of the main conveyor in the Svea Coal Mine in Norway , 2014 .
[14] Enrico Zio,et al. An Introduction to the Basics of Reliability and Risk Analysis , 2007 .
[15] Pritam Kumar,et al. Reliability, Availability and Maintainability Analysis of the Main Conveyor System in Underground Coal Mine: A Case Study of Churcha (RO) Mine , 2016 .
[16] J. I. Ansell,et al. Practical Methods for Reliability Data Analysis , 1994 .
[17] Balbir S. Dhillon,et al. Maintainability, Maintenance, and Reliability for Engineers , 2006 .
[18] Uday Kumar,et al. Reliability analysis of Load-Haul-Dump machines , 1990 .
[19] Mohammad Javad Rahimdel,et al. Reliability-based maintenance scheduling of hydraulic system of rotary drilling machines , 2013 .
[20] A. K. Mukhopadhyay,et al. Reliability Analysis of Overhauled Engines of Dumpers , 2014 .
[21] Uday Kumar,et al. Reliability analysis of mining equipment: A case study of a crushing plant at Jajarm Bauxite Mine in Iran , 2008, Reliab. Eng. Syst. Saf..
[22] Uday Kumar,et al. Reliability Analysis and Comparison Between Automatic and Manual Load Haul Dump Machines , 2015, Qual. Reliab. Eng. Int..
[23] Seyed Rahman Torabi,et al. RAM Analysis of Hydraulic System of Earth Pressure Balance Tunnel Boring Machine , 2015 .
[24] Nick Vayenas,et al. Maintenance and reliability analysis of a fleet of load-haul-dump vehicles in an underground hard rock mine , 2009 .
[25] Erkan Topal,et al. A new MIP model for mine equipment scheduling by minimizing maintenance cost , 2010, Eur. J. Oper. Res..