Stochastic Horizons for the Aggregate Planning Problem

This paper develops a methodology for showing how forecast horizons for stochastic planning problems relate to the planning procedures and the information system within the organization. To illustrate the approach we have chosen a relatively straightforward production problem where the firm can meet a fluctuating demand pattern through a combination of overtime and inventory-related options. We show that the optimal production plan is monotonically non-decreasing in the demand sequence so that bounds can be placed on the optimal first period production plan for an N-period problem. These bounds together with information and computationally-related costs are used in specifying a methodology for determining forecast horizons. An illustrative example suggests that such horizons are likely to be small in many realistic cases. The concluding section indicates how this methodology can be utilized for specifying stochastic horizons for more general aggregate planning decisions in organizations.

[1]  S. Karlin Dynamic Inventory Policy with Varying Stochastic Demands , 1960 .

[2]  M. Beckmann Production Smoothing and Inventory Control , 1961 .

[3]  J. Hicks,et al.  The Role of Anticipations and Plans in Economic Behaviour and Their Use in Economic Analysis and Forecasting , 1963 .

[4]  Kalman J. Cohen,et al.  The Role of Anticipations and Plans in Economic Behavior and Their use in Economic Analysis and Forecasting , 1964 .

[5]  A. F. Veinott Production Planning with Convex Costs: A Parametric Study , 1964 .

[6]  A. F. Veinott Optimal Policy in a Dynamic, Single Product, Nonstationary Inventory Model with Several Demand Classes , 1965 .

[7]  Calyampudi Radhakrishna Rao,et al.  Linear Statistical Inference and its Applications , 1967 .

[8]  A. Charnes,et al.  Decision and horizon rules for stochastic planning problems : a linear example , 1966 .

[9]  Charles H. Kriebel,et al.  Information Processing and Programmed Decision Systems , 1969 .

[10]  Matthew J. Sobel Making Short-Run Changes in Production when the Employment Level is Fixed , 1970, Oper. Res..

[11]  P. Kleindorfer,et al.  Optimal Distributed Lags and the Horizon Problem. , 1971 .

[12]  C. Argyris Management Information Systems: The Challenge to Rationality and Emotionality , 1971 .

[13]  Howard Kunreuther Production-Planning Algorithms for the Inventory-Overtime Tradeoff , 1971, Oper. Res..

[14]  E. Prescott THE MULTI-PERIOD CONTROL PROBLEM UNDER UNCERTAINTY , 1972 .

[15]  Keith Glover,et al.  Linear convex stochastic optimal control with applications in production planning , 1971, CDC 1971.

[16]  Howard Kunreuther,et al.  Planning Horizons for Production Smoothing with Deterministic Demands: I. All Demand Met from Regular Production , 1973 .

[17]  J. Hammond Simplifying the Choice between Uncertain Prospects Where Preference is Nonlinear , 1974 .

[18]  Dimitri P. Bertsekas,et al.  Dynamic Programming and Stochastic Control , 1977, IEEE Transactions on Systems, Man, and Cybernetics.

[19]  Robert P. King,et al.  Operational Techniques for Applied Decision Analysis Under Uncertainty , 1979 .