Joint optimization of preventive maintenance and spare parts inventory using genetic algorithms and particle swarm optimization algorithm

The problem of joint optimization of preventive maintenance and spare parts inventory was solved in this paper. The novelty of this study lies with the fact that the developed method could tackle not only the artificial test case but also a real-world industrial problem. Various investigators developed several methods and semi-analytical tools for obtaining optimum solutions for this problem. In this study, non-traditional optimization tools, namely genetic algorithms (GA) and particle swarm optimization (PSO) algorithm were utilized to obtain the joint optimum preventive maintenance and spare parts inventory ordering interval. The optimum values of time interval yielded by both the GA and PSO algorithm were compared and found to be in agreement with the published results for the similar models obtained through semi-numerical methods. It proves the applicability of these non-traditional optimization tools to solve these problems. This investigation ended with the analysis of preventive maintenance data taken from an industry, for an electric overhead traveling crane. The optimum time schedules so suggested by the GA and PSO algorithm were found to be cost effective, in comparison with the current practice being followed by the industry. A sensitivity analysis was also conducted at the end for this industrial problem.

[1]  Nani Kurniati,et al.  A Case Study on Optimal Maintenance Interval and Spare Part Inventory Based on Reliability , 2013 .

[2]  Alenka Hudoklin,et al.  SOME SIMPLE APPROACHES TO PLANNING THE INVENTORY OF SPARE COMPONENTS OF AN INDUSTRIAL SYSTEM , 2010 .

[3]  Ali Gharbi,et al.  Optimal safety stocks and preventive maintenance periods in unreliable manufacturing systems , 2007 .

[4]  Shunji Osaki,et al.  Optimum Replacement Policies for A System Composed of Components , 1981, IEEE Transactions on Reliability.

[5]  Ford W. Harris,et al.  How Many Parts to Make at Once , 1990, Oper. Res..

[6]  Bo Guo,et al.  Collaborative optimization of maintenance and spare ordering of continuously degrading systems , 2012 .

[7]  Liliane Pintelon,et al.  The Effect of Maintenance Quality on Spare Parts Inventory for a Fleet of Assets , 2013, IEEE Transactions on Reliability.

[8]  K.-J. Kim,et al.  Optimal Joint Spare Stocking and Block Replacement Policy (Cost Modelling of Spare Stocking and Block Replacement) , 2001 .

[9]  Yu-Hung Chien,et al.  Optimal Spare Ordering Time for Preventive Replacement to Maximize the Cost Effectiveness , 2010 .

[10]  Michael J. Armstrong,et al.  A note on joint optimization of maintenance and inventory , 1998 .

[11]  Yu-Hung Chien Generalized spare ordering policies with allowable inventory time , 2005, Int. J. Syst. Sci..

[12]  Kyung S. Park,et al.  Ordering Policies under Minimal Repair , 1986, IEEE Transactions on Reliability.

[13]  Alenka Hudoklin,et al.  Joint optimization of block-replacement and periodic-review spare-provisioning policy , 2003, IEEE Trans. Reliab..

[14]  Mustapha Nourelfath,et al.  Integrating production, inventory and maintenance planning for a parallel system with dependent components , 2012, Reliab. Eng. Syst. Saf..

[15]  Haitao Liao,et al.  Joint Production and Spare Part Inventory Control Strategy Driven by Condition Based Maintenance , 2010, IEEE Transactions on Reliability.

[16]  F.E. Ciarapica,et al.  Spare parts inventory control for the maintenance of productive plants , 2008, 2008 IEEE International Conference on Industrial Engineering and Engineering Management.

[17]  Hui Xiao,et al.  Optimal allocation and maintenance of multi-state elements in series-parallel systems with common bus performance sharing , 2014, Comput. Ind. Eng..

[18]  Shunji Osaki,et al.  Optimum Ordering Policies with Lead Time for an Operating Unit in Preventive Maintenance , 1978, IEEE Transactions on Reliability.

[19]  Lifeng Xi,et al.  Modeling and Analyzing a Joint Optimization Policy of Block-Replacement and Spare Inventory With Random-Leadtime , 2008, IEEE Transactions on Reliability.

[20]  Semra Tunali,et al.  Joint optimization of spare parts inventory and maintenance policies using genetic algorithms , 2007 .

[21]  Hoang Pham,et al.  Handbook of reliability engineering , 2013 .

[22]  Marvin Zelen,et al.  Mathematical Theory of Reliability , 1965 .

[23]  Aris A. Syntetos,et al.  Spare parts management : a review of forecasting research and extensions , 2010 .

[24]  Toshio Nakagawa,et al.  Maintenance Theory of Reliability , 2005 .

[25]  James B. O'Neill,et al.  An Application of Classical Inventory Analysis to a Spare Parts Inventory , 1978 .

[26]  Mohamad Y. Jaber,et al.  Inventory Management : Non-Classical Views , 2009 .

[27]  D. Acharya,et al.  Jointly Optimal Block-Replacement and Spare Provisioning Policy , 1986, IEEE Transactions on Reliability.

[28]  Mustapha Nourelfath,et al.  Joint redundancy and imperfect preventive maintenance optimization for series-parallel multi-state degraded systems , 2012, Reliab. Eng. Syst. Saf..

[29]  Uday Kumar,et al.  Reliability and operating environment‐based spare parts estimation approach: A case study in Kiruna Mine, Sweden , 2005 .

[30]  Wei Xie,et al.  Maximizing system availability through joint decision on component redundancy and spares inventory , 2014, Eur. J. Oper. Res..

[31]  James Kennedy,et al.  Particle swarm optimization , 1995, Proceedings of ICNN'95 - International Conference on Neural Networks.

[32]  Min Xie,et al.  Joint Maintenance and spare Component Provisioning Policy for k-out-of-n Systems , 2013, Asia Pac. J. Oper. Res..

[33]  Hoang Pham,et al.  Reliability and Optimal Maintenance , 2006 .

[34]  John H. Holland,et al.  Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control, and Artificial Intelligence , 1992 .

[35]  Matthieu van der Heijden,et al.  Joint optimization of level of repair analysis and spare parts stocks , 2012, Eur. J. Oper. Res..

[36]  Dragan Banjevic,et al.  Optimization models for critical spare parts inventories—a reliability approach , 2011, J. Oper. Res. Soc..

[37]  Baris Selçuk,et al.  Joint spare parts inventory and reliability decisions under a service constraint , 2013, J. Oper. Res. Soc..

[38]  Tore Markeset,et al.  Application of reliability models with covariates in spare part prediction and optimization - A case study , 2014, Reliab. Eng. Syst. Saf..

[39]  M. Marseguerra,et al.  Simulation modelling of repairable multi-component deteriorating systems for 'on condition' maintenance optimisation , 2002, Reliab. Eng. Syst. Saf..

[40]  Jun Xie,et al.  Model for a Two-Echelon Inventory System with Neighbor Support , 2008, 2008 4th International Conference on Wireless Communications, Networking and Mobile Computing.

[41]  Ying Peng,et al.  A dynamic predictive maintenance model considering spare parts inventory based on hidden semi-Markov model , 2013 .