Evaluation of dowel bar retrofit for long-term pavement life in Washington State

The Washington State Department of Transportation (WSDOT) maintains approximately 2,400 lane miles of concrete pavements, many of which are on the heavily traveled interstate highway network. Many of these concrete pavements have more than doubled their intended performance life. Due primarily to traffic disruption, WSDOT has long recognized the potentially costly rehabilitation and reconstruction needs of the aging concrete pavement network. In 1993, WSDOT began dowel bar retrofitting its faulted concrete pavements. Dowel bar retrofit has had varied success in the United States, primarily due to construction techniques. In Washington State overall, dowel bar retrofit has been successful and has been determined to be a cost effective rehabilitation treatment. What is still unknown are the most applicable time or condition level (i.e. faulting and cracking condition) for applying dowel bar retrofit, its long‐term performance, and its failure mechanism. The outcomes of this study include guidelines for dowel bar retrofit project selection and construction best practices, a summary of dowel bar retrofit performance in Washington State, and estimated dowel bar retrofit project costs.

[1]  David Lange,et al.  Creep, Shrinkage, and Cracking of Restrained Concrete at Early Age , 2001 .

[2]  David L Lippert PERFORMANCE EVALUATION OF JOINTED CONCRETE PAVEMENT REHABILITATION WITHOUT RESURFACING , 1986 .

[3]  L L Smith LOAD TRANSFER AT CONTRACTION JOINTS IN PLAIN PORTLAND CEMENT CONCRETE PAVEMENTS , 1965 .

[4]  M I Darter,et al.  The Longevity and Performance of Diamond-Ground Pavements , 1999 .

[5]  A L Correa,et al.  CONCRETE PAVEMENT REHABILITATION - GUIDE FOR DIAMOND GRINDING , 2001 .

[6]  R K Moore Analysis, design, and construction of transverse joint load transfer systems for rigid pavements , 1994 .

[7]  Samuel H Carpenter,et al.  RESTORATION OF JOINT LOAD TRANSFER , 1988 .

[8]  John T Harvey,et al.  An Investigation of Dowel Bar Retrofit Strategies , 2005 .

[9]  Mark B Snyder,et al.  Performance Testing of Experimental Dowel Bar Retrofit Designs Part 2 - Repeatability and Modified Designs , 2003 .

[10]  John T Harvey,et al.  Construction and Test Results on Dowel Bar Retrofit HVS Test Sections 556FD, 557FD, 558FD, and 559FD: State Route 14, Los Angeles County at Palmdale , 2008 .

[11]  J E Hunt PORTLAND CEMENT CONCRETE PAVEMENT RESTORATION. FINAL REPORT , 1989 .

[12]  Carlos E. Correa,et al.  REHABILITATION STRATEGIES FOR HIGHWAY PAVEMENTS , 2001 .

[13]  E Embacher,et al.  CONSTRUCTION REPORT ON THE INSTALLATION OF RETROFIT DOWEL BAR TEST SECTIONS ON TH 23 , 2001 .

[14]  S H Carpenter,et al.  RIGID PAVEMENT ANALYSIS AND DESIGN. FINAL REPORT. PHASE I , 1989 .

[15]  A Toepel,et al.  REPORT ON EARLY DISTRESS (RED) RETROFIT DOWEL BARS ON I-39 , 2002 .

[16]  Linda M Pierce,et al.  URBAN INTERSTATE PORTLAND CEMENT CONCRETE PAVEMENT REHABILITATION ALTERNATIVES FOR WASHINGTON STATE. FINAL REPORT , 1991 .

[17]  Michael I Darter,et al.  PERFORMANCE MONITORING OF JOINT LOAD TRANSFER RESTORATION. FINAL REPORT , 1992 .

[18]  John T. Harvey,et al.  Performance of Dowel Bar Retrofitted Concrete Pavement Under HVS Loading , 2002 .

[19]  John T Harvey,et al.  Data Mining of the Caltrans Pavement Management System (PMS) Database , 2004 .

[20]  Linda M Pierce PORTLAND CEMENT CONCRETE PAVEMENT REHABILITATION IN WASHINGTON STATE: CASE STUDY , 1994 .

[21]  Karl Smith,et al.  Slab replacement and dowel bar retrofit, district 11, San Diego County , 2002 .

[22]  Mark B Snyder,et al.  Performance Testing of Experimental Dowel Bar Retrofit Designs Part 1 – Initial Testing , 2003 .

[23]  William G. Davids,et al.  3D Finite Element Study on Load Transfer at Doweled Joints in Flat and Curled Rigid Pavements , 2001 .

[24]  L T Oehler,et al.  FINAL REPORT ON DESIGN PROJECT, MICHIGAN TEST ROAD , 1959 .

[25]  Lev Khazanovich,et al.  Analysis of Concrete Pavement Responses to Temperature and Wheel Loads Measured from Intrumented Slabs , 1998 .

[26]  D Brown,et al.  IMPROVING LOAD TRANSFER IN EXISTING JOINTED CONCRETE PAVEMENTS. FINAL REPORT , 1983 .

[27]  Wei-Shih Yang,et al.  REHABILITATION PROCEDURES FOR FAULTED RIGID PAVEMENT , 1993 .