An Accelerated Load Sequence Design Method Based on Merged Markov Matrix
暂无分享,去创建一个
[1] Cristin Olimpiu Morariu,et al. Life time prediction using acceLerated test data of the specimens from mechanicaL eLement prognozowanie czasu pracy eLementu mechanicznego z wykorzystaniem danych z badań przyspieszonych , 2012 .
[2] William Q. Meeker,et al. A Review of Accelerated Test Models , 2006, 0708.0369.
[3] Mohamed T. Madi,et al. Step-Stress Accelerated Life Tests , 2011, International Encyclopedia of Statistical Science.
[4] Hyunsu Cho,et al. A Parameter Sensitivity Analysis for the Dynamic Model of a Variable Displacement Axial Piston Pump , 1987 .
[5] Preeti Wanti Srivastava,et al. Optimum ramp-stress accelerated life test for m identical repairable systems , 2011 .
[6] Dong Soo Jung,et al. Development of Accelerated Life Test Method of Hydraulic Pump , 2006 .
[7] G. G. Stokes. "J." , 1890, The New Yale Book of Quotations.
[8] W. B. Nelson,et al. A bibliography of accelerated test plans part II - references , 2005, IEEE Transactions on Reliability.
[9] J.J. Palazzolo,et al. Leakage Fault Detection Method for Axial-Piston Variable Displacement Pumps , 2008, 2008 IEEE Aerospace Conference.
[10] E. A. Elsayed,et al. Design of Reliability Test Plans: An Overview , 2013 .
[11] Elsayed A. Elsayed,et al. Overview of Reliability Testing , 2012, IEEE Transactions on Reliability.
[12] Stefano Beretta,et al. Load spectra analysis and reconstruction for hydraulic pump components , 2008 .
[13] Hai-Yan Xu,et al. Planning Step-Stress Accelerated Life Tests With Two Experimental Variables , 2007, IEEE Transactions on Reliability.
[14] Guang-Bin Yang,et al. Optimum constant-stress accelerated life-test plans , 1994 .
[15] W. Nelson,et al. Optimum Simple Step-Stress Plans for Accelerated Life Testing , 1983, IEEE Transactions on Reliability.
[17] Pär Johannesson. Rainflow Cycles for Switching Processes with Markov Structure , 1998 .
[18] W. B. Nelson,et al. A bibliography of accelerated test plans , 2005, IEEE Transactions on Reliability.
[19] Roberto Tovo,et al. On fatigue cycle distribution in non-stationary switching loadings with Markov chain structure , 2010 .
[20] Om Prakash Yadav,et al. A literature review on planning and analysis of accelerated testing for reliability assessment , 2017, Qual. Reliab. Eng. Int..
[21] Kojj Kato,et al. Abrasive wear of metals , 1997 .