MODEL VALIDATION FOR A WASTEWATER TREATMENT PLANT
暂无分享,去创建一个
Abstract In this paper, the different steps required for model validation as applied to a wastewater treatment plant are discussed. A mathematical model very useful to implement the automation, the methodology to determine kinetic parameters and the required information for the most important process variables are presented. Finally, how to validate this model is explained, followed by the relevant conclusions.
[1] Arthur E. Humphrey,et al. Dynamic measurement of the volumetric oxygen transfer coefficient in fermentation systems , 1967 .
[2] Derin Orhon,et al. Modelling of activated sludge systems , 1994 .
[3] H. D. Stensel,et al. Wastewater Engineering: Treatment and Reuse , 2002 .
[4] D. Dochain,et al. On-Line Estimation and Adaptive Control of Bioreactors , 2013 .