Simulation of Construction Operations Applied to In Situ Concrete Frameworks

The erection process of in situ cast concrete frameworks in multi-storey housing consists of multiple on site activities in which labour, equipment and materials are interacting in a complex system. Studies have shown that the current process involves a wide range of non-value adding activities, resulting in poor process efficiency. This paper presents a model developed for discrete-event simulation of activities and resource use involved in the construction of in situ cast concrete frameworks in multi-storey housing. The model simulates the work flow which is subject to multiple work locations and resource availability constraints. The model has been developed and validated by studying four ongoing projects. The model functionality and simulation approach are described. The validation of the model is also described and finally a parametric study is conducted to demonstrate the use of the model. It is shown that the model can reproduce the dynamic behaviour in a work flow constrained by resource availability. The model can be used to analyze how different production strategies involving resource allocation influence total construction time and cost.

[1]  Photios G. Ioannou,et al.  THE INVESTIGATION OF LEAD-TIME BUFFERING UNDER UNCERTAINTY USING SIMULATION AND COST OPTIMIZATION , 2007 .

[2]  D.W. Halpin,et al.  Lean construction and simulation , 2002, Proceedings of the Winter Simulation Conference.

[3]  Kuo-Shun Sun,et al.  Planning gang formwork operations for building construction using simulations , 2004 .

[4]  D.W. Halpin,et al.  Simulation as a tool for resource management , 2000, 2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165).

[5]  Sergio Maturana,et al.  Modeling the Impact of Multiskilling and Concrete Batch Size in Multi-Story Buildings , 2003 .

[6]  Per-Erik Josephson,et al.  Slöseri i byggprojekt: behov av förändrat synsätt , 2005 .

[7]  Pedro Gazmuri,et al.  Design of Work in Process Buffers in Repetitive Building Projects: A Case Study , 2006 .

[8]  Julio C. Martinez,et al.  Stroboscope: State and resource based simulation of construction processes. , 1996 .

[9]  Iris D. Tommelein,et al.  Simulation of Buffering and Batching Practices in the Interface Detailing-Fabrication-Installation of HVAC Ductwork , 2004 .

[10]  Daniel W. Halpin,et al.  CYCLONE — Method for Modeling Job Site Processes , 1977 .

[11]  Iris D. Tommelein,et al.  SIMULATION AS A TOOL FOR PRODUCTION SYSTEM DESIGN IN CONSTRUCTION , 2006 .

[12]  Iris D. Tommelein Discrete-Event Simulation of Lean Construction Processes , 1997 .

[13]  Ming Lu,et al.  Comparison of two simulation methodologies in modeling construction systems: Manufacturing-oriented PROMODEL vs. construction-oriented SDESA , 2007 .

[14]  Daniel W. Halpin,et al.  Simulation experiment for improving construction processes , 2004, Proceedings of the 2004 Winter Simulation Conference, 2004..