Design for Manufacturability and Concurrent Engineering for Product Development

In the 1980s, companies began to feel the effect of three major influences on their product development: newer and innovative technologies, increasing product complexity and larger organizations. And therefore companies were forced to look for new product development methods. This paper tries to focus on the two of new product development methods (DFM and CE). The aim of this paper is to see and analyze different product development methods specifically on Design for Manufacturability and Concurrent Engineering. Companies can achieve and be benefited by minimizing product life cycle, cost and meeting delivery schedule. This paper also presents simplified models that can be modified and used by different companies based on the companies’ objective and requirements. Methodologies that are followed to do this research are case studies. Two companies were taken and analysed on the product development process. Historical data, interview were conducted on these companies in addition to that, Survey of literatures and previous research works on similar topics has been done during this research. This paper also tries to show the implementation cost benefit analysis and tries to calculate the implementation time. From this research, it has been found that the two companies did not achieve the delivery time to the customer. Some of most frequently coming products are analyzed and 50% to 80 % of their products are not delivered on time to the customers. The companies are following the traditional way of product development that is sequentially design and production method, which highly affect time to market. In the case study it is found that by implementing these new methods and by forming multi disciplinary team in designing and quality inspection; the company can reduce the workflow steps from 40 to 30. Keywords—Design for manufacturability, Concurrent Engineering, Time-to-Market, Product development.

[1]  Preston G. Smith,et al.  Developing products in half the time , 1995 .

[2]  Linda Gorchels The Product Manager's Handbook , 1995 .

[3]  Geoffrey Boothroyd,et al.  Product design for manufacture and assembly , 1994, Comput. Aided Des..

[4]  Donald G. Reinertsen Managing The Design Factory: A Product Developer's Toolkit , 1997 .

[5]  Hamid R. Parsaei,et al.  Concurrent engineering : contemporary issues and modern design tools , 1993 .

[6]  Karl T. Ulrich,et al.  Product Design and Development , 1995 .

[7]  Soumitra Dutta,et al.  Process Reengineering, Organizational Change and Performance Improvement , 1999 .

[8]  Alemu Moges Concurrent Engineering and Implementation A Case Study in Addis Engineering Center , 2007 .

[9]  J. Hartley. Concurrent Engineering: Shortening Lead Times, Raising Quality, and Lowering Costs , 1998 .

[10]  Jon Turino Managing Concurrent Engineering: Buying Time to Market : A Definitive Guide to Improved Competitiveness in Electronics Design and Manufacturing , 1992 .

[11]  Mårten Karlsson Green Concurrent Engineering: a model for DFE management programs , 2001 .

[12]  David M. Anderson Design for Manufacturability: Optimizing Cost, Quality, and Time-To-Market , 1990 .

[13]  Donald E. Carter,et al.  Ce Concurrent Engineering: The Product Development Environment for the 1990s , 1992 .

[14]  Preston G. Smith,et al.  Developing Products in Half the Time: New Rules, New Tools, 2nd Edition (Создание новых продуктов за половину времени: новые правила, новые инструменты) , 1997 .